Doh, Hyoung Ho (도형호)
Email:
Research Area:
Occupation: Hanyang University
2009 M.S. Graduation Thesis:
Production Planning in Remanufacturing Systems: Mathematical Model and Solution Algorithms
Remanufacturing, one of the most advanced product recovery options, processes used or end-of-life products with disassembly, reprocessing, and reassembly operations in such a way that their qualities are as good as new in terms of appearance, reliability, and performance. Among various issues in remanufacturing, we focus on production planning over a given planning horizon for the objective of maximizing the total profit, i.e., difference between the revenues and relevant costs. The main decisions are: (a) number of products to be disassembled and disposed in each period; (b) number of parts and components to be reprocessed and disposed in each period; (c) number of parts and components to be purchased in each period; and (d) number of products to be reassembled in each period. In particular, we extend the existing model by incorporating setup costs and times. A mixed integer programming model is developed to represent the problem. Then, due to the complexity of the problem, heuristic algorithms, based on the linear programming-based technique, are suggested in this paper. Computational experiments were done on various test problems, and the results are reported.
Lab Seminars:
1. |
Mathematical formulations for the optimal sequencing and lot sizing in multi product synchronous assembly lines |
2021.08.09 |
2. |
A deep reinforcement learning approach for chemical production scheduling |
2021.02.08 |
3. |
Multi-stage multi-product multi-period production planning with sequence-dependent setups in closed-loop supply chain |
2020.07.28 |
4. |
Generation expansion planning in multi electricity markets considering environmental impacts |
2020.03.11 |
5. |
A neural network model for solving the lot-sizing problem |
2019.07.17 |
6. |
A mathematical model for production planning in hybrid manufacturing remanufacturing systems |
2019.01.07 |
7. |
Multi commodity, multi vehicle pick-up and delivery problem with time window |
2018.08.08 |
8. |
Robust production planning and control for multi-stage systems with flexible final assembly lines |
2018.02.06 |
9. |
A new silver-meal based heuristic for the single-item dynamic lot-sizing problem with returns and remanufacturing |
2017.07.25 |
10. |
Dynamic lot-sizing for disassembly and reprocessing in remanufacturing systems |
2017.01.10 |
11. |
Models and algorithms for the dynamic-demand joint replenishment problem |
2016.08.18 |
12. |
The one-warehouse multi-retailer problem: reformulation, classification, and computational results |
2016.07.19 |
13. |
A dynamic inventory model with supplier selection in a serial supply chain structure. |
2016.02.16 |
14. |
Integrated Lot Sizing in Serial Supply Chains with Production Capacities. |
2016.02.11 |
15. |
GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem. |
2015.01.13 |
16. |
A single-product parallel-facilities production-planning model. |
2012.01.08 |
17. |
A Multi-product Dynamic Lot-size Model with Individual and Joint Set-Up Costs. |
2011.8.16 |
18. |
Efficient, effective lot sizing for multistage production system. |
2011.7.5 |
19. |
An Integration Model and its Extension for Disassembly Leveling and Lot-sizing for Multiple Product Types. |
2011.12.21 |
20. |
A capacity-constrained multi-level inventory and production control problem. |
2010.2.15 |
21. |
Minimum concave cost production system_a further generalization of multiechelon model. |
2010.1.27 |
22. |
On the optimal design of the disassembly and recovert process (1.07) |
2009 |
23. |
Deterministic Production Planning with Concave Cost and Capacity Constraints. (1.21) |
2009 |
24. |
Capacitated dynamic lot sizing problems in closed-loop supply chain. (2.04) |
2009 |
25. |
The market-orienred dynamic product recovery model in the just-in-time framework (3.04) |
2009 |
26. |
An optimal inventory model for the intermediate echelon when repair is possible. (7.22) |
2009 |
27. |
Capacipated dynamic lot sizing problems in closed-loop supply chain. (8.13) |
2009 |
28. |
Solving mixed integer programming production planning problems with setups by shadow price information (07.09) |
2008 |
29. |
On alternative mixed integer programming formulations and LP-based heuristics for lot-sizing with setup times (07.30) |
2008 |
30. |
MIP-based heuristics for capacitated lotsizing problems (08.26) |
2008 |
31. |
Optimal control of a one product recovery system with leadtimes (7.2) |
2007 |
32. |
Production planning for closed-loop supply chains with product recovery and reuse: an analystical approach (7.18) |
2007 |
33. |
Remanufacturing planning fir the reverse Wagner / Whitin models (8.14) |
2007 |
|