2018
1. Cho, Y.-H., Doh, H.-H., and Lee, D.-H.
Mathematical model and solution algorithms for capacitated dynamic lot-sizing in remanufacturing systems
Industrial Engineering & Management Systems, Vol. 17, No. 1, pp. 1-13. (SCOPUS)
2. Kim, D.-H., Doh, H.-H., and Lee, D.-H.
Multi-period Disassembly Levelling and Lot-sizing for Multiple Product Types with Parts Commonality
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 232, No. 5, pp. 867-878 (SCI)
3. Kim, H.-W. and Lee, D.-H.
A sample average approximation algorithm for selective disassembly sequencing with abnormal disassembly operations and random operation times
The International Journal of Advanced Manufacturing Technology, Vol. 96, No. 1-4, pp. 1341-1354. (SCIE)
4. Kim, H.-W., Park, C., and Lee, D.-H.
Selective disassembly sequencing with random operation times in Parallel Disassembly Environment
International Journal of Production Research, DOI:10.1080/00207543.2018.14329110 (SCI) – Online available
5. Yu, J.-M. and Lee, D.-H.
Solution algorithms to minimize the total family tardiness for job shop scheduling with job families
European Journal of Industrial Engineering, Vol. 12, No. 1, pp. 1-23. (SCIE)
6. Yu, J.-M., and Lee, D.-H.
Scheduling algorithms for job-shop-type remanufacturing systems with component matching requirement
Computers & Industrial Engineering, Vol. 120, No. 1, pp. 266-278. (SCIE)
2017
7. Kim, H.-W. and Lee, D.-H.
An optimal algorithm for selective disassembly sequencing with sequence-dependent set-ups in parallel disassembly environment
International Journal of Production Research, Vol. 55, No. 24, pp. 7317-7333. (SCI)
8. KIM, J.-M., Zhou, Y.-D., and Lee, D.-H.
Priority scheduling to minimize the total tardiness for remanufacturing systems with flow-shop-type reprocessing lines
The International Journal of Advanced Manufacturing Technology, Vol. 91, No. 9-12, pp. 3697–3708. (SCIE)
9. Kim, J.-S., Park, J.-H. and Lee, D.-H.
Iterated Greedy Algorithms to Minimize Total Family Flow Time for Job Shop Scheduling with Job Families and Sequence-dependent Setups
Engineering Optimization, Vol. 49, No. 10, pp. 1719-1732. (SCIE)
10. Yu, J.-M., Huang, R. and Lee, D.-H.
Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops
International Journal of Production Research, Vol. 55, No. 11, pp. 3266-3282. (SCI)
2016
11. Doh, H.-H., Yu, J.-M., Kwon, Y.-J., Suh, M.-S., and Lee, D.-H.
Priority Scheduling for a Flexible Job Shop with a Reconfigurable Manufacturing Cell
Industrial Engineering & Management Systems, Vol. 15, No.1, pp. 11-18. (SCOPUS)
12. Kang, K.-W., Doh, H.-H., Park, J.-H., and Lee, D.-H.
Disassembly Leveling and Lot-sizing for Multiple Product Types: a Basic Model and its Extension
International Journal of Advanced Manufacturing Technology, Vol. 82, No. 9-12, pp. 1463-1473. (SCIE)
2015
13. Kim, J.-S. and Lee, D.-H.
An Integrated Approach for Collection Network Design, Capacity Planning and Vehicle Routing in Reverse Logistics
Journal of the Operational Research Society, Vol. 66, No.1, pp. 76-85. (SCI)
14. Kim, J.-S. and Lee, D.-H.
A Case Study on Collection Network Design, Capacity Planning and Vehicle Routing in Reverse Logistics
International Journal of Sustainable Engineering, Vol. 8, No.1, pp. 66-76. (SCOPUS)
15. Kim, M.-G., Yu, J.-M. and Lee, D.-H.
Scheduling Algorithms for Remanufacturing Systems with Flow-Shop-Type Reprocessing Lines
International Journal of Production Research, Vol. 53, No. 6, pp. 1819-1831. (SCI)
16. Lee, C.-W., Doh, H.-H. and Lee, D.-H.
Capacity and Production Planning for a Hybrid System with Manufacturing and Remanufacturing Facilities
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 229, No. 9, pp. 1645-1653. (SCI)
2014
17. Yu, Z.-J., Shin, J.-H. and Lee, D.-H.
An Operation-level Dynamic Capacity Scalability Model for Reconfigurable Manufacturing Systems
International Journal of Industrial Engineering: Theory, Applications and Practice, Vol.21, No. 6, pp. 317-326. (SCIE)
2013
18. Doh, H.-H., Yu, J.-M., Kim, J.-S., Lee, D.-H., and Nam, S.-H.
A Priority Scheduling Approach for Flexible Job Shops with Multiple Process Plans
International Journal of Production Research, Vol. 51, No. 12, pp. 3748-3764. (SCI)
19. Go, H., Kim, J.-S., and Lee, D.-H.
Operation and Preventive Maintenance Scheduling of Containerships: Mathematical Model and Solution Algorithm
European Journal of Operational Research, Vol. 229, No. 3, pp. 626-636. (SCIE)
20. Han, H.-J., Yu, J.-M., and Lee, D.-H.
Mathematical Model and Solution Algorithms for Selective Disassembly Sequencing with Multiple Target Components and Sequence-Dependent Setups
International Journal of Production Research, Vol. 51, No.16, pp. 4997-5010. (SCI)
21. Kim, J.-G., Yu, J.-M., and Lee, D.-H.
Common Due-date Assignment and Scheduling on Parallel Machines with Sequence-dependent Setup Times
Management Science and Financial Engineering, Vol.19, No. 1, pp. 29-36. (SCOPUS)
22. Kim, J.-S. and Lee, D.-H.
Designing Refuse Collection Networks under Capacity and Maximum Allowable Distance Constraints
Management Science and Financial Engineering, Vol. 19, No. 2, pp. 19-29. (SCOPUS)
23. Kim, J.-S. and Lee, D.-H.
A Restricted Dynamic Model for Designing Refuse Collection Networks in Reverse Logistics
Computers & Industrial Engineering, Vol. 66, No. 4, pp. 1131-1137. (SCIE)
24. Kwon, Y.-J., Choi, Y.-J., and Lee, D.-H.
Heterogeneous Fixed Fleet Vehicle Routing Considering Carbon Emission
Transportation Research Part D: Transport and Environment, Vol. 23, pp. 81-89. (SCIE)
25. Lee, J.-H., Yu, J.-M., and Lee, D.-H.
A Tabu Search Algorithm for Unrelated Parallel Machine Scheduling with Sequence and Machine Dependent Setups: Minimizing Total Tardiness
International Journal of Advanced Manufacturing Technology, Vol. 69, No.9-12, pp. 2081-2089. (SCIE)
26. Yu, J.-M., Doh, H.-H., Kim, J.-S., Kwon, Y.-J., Lee, D.-H., and Nam, S.-H.
Input Sequencing and Scheduling for a Reconfigurable Manufacturing System with a Limited Number of Fixtures
International Journal of Advanced Manufacturing Technology, Vol. 67, No. 1-4, pp. 157-169. (SCIE)
2012
27. Jun, H.-B., Lee, D.-H., Kim, J.-G., and Kiritsis, D.
Heuristic algorithms for minimising total recovery cost of end-of-life products under quality constraints
International Journal of Production Research, Vol. 50, No. 19, pp. 5330-5347. (SCI)
28. Kim, H.-W., Yu, J.-M., Kim, J.-S., Doh, H.-H., Lee, D.-H., and Nam, S.-H.
Loading Algorithms for Flexible Manufacturing Systems with Partially Grouped Unrelated Machines and Additional Tooling Constraints
International Journal of Advanced Manufacturing Technology, Vol. 58, No. 5, pp. 683-691. (SCIE)
29. Kim, J.-G., Kim, J.-S., and Lee, D.-H.
Common Due-date Assignment and Sequencing with Sequence-dependent Setup Times: a Case Study on a Paper Remanufacturing System
Management Science and Financial Engineering, Vol. 18, No. 1, pp. 1-12. (SCOPUS)
30. Kim, J.-G., Kim, J.-S., and Lee, D.-H.
Fast and meta-heuristics for common due-date assignment and scheduling on parallel machines
International Journal of Production Research, Vol. 50, No. 20, pp. 6040-6057. (SCI)
31. Yu, J.-M., Doh, H.-H., Kim, H.-W., Kim, J.-S., Lee, D.-H., and Nam, S.-H.
Iterative Algorithms for Part Grouping and Loading in Cellular Reconfigurable Manufacturing Systems
Journal of the Operational Research Society, Vol. 63, No. 12, pp. 1635-1644. (SCI)
2011
32. Ahn, H.- D., Lee, D.-H., and Kim, H.-J.
Solution Algorithms for Dynamic Lot-sizing in Remanufacturing Systems
International Journal of Production Research, Vol. 49, No. 22, pp. 6729-6748. (SCI)
33. Choi, H.-S., Kim, J.-S., and Lee, D.-H.
Real-Time Scheduling for Reentrant Hybrid Flow Shops: a Decision Tree based Mechanism and its Application to a TFT-LCD line
Expert Systems with Applications, Vol. 38, No. 4, pp. 3514-3521. (SCIE)
34. Ha, K.-W., Yu, J.-M., Park, J.-I., and Lee, D.-H.
Priority Rule based Heuristics for the Team Orienteering Problem
Management Science and Financial Engineering, Vol. 17, No. 1, pp. 79-94. (SCOPUS)
35. Kim, J.-G., Kim, J.-S., and Lee, D.-H.
A Case Study on Period Vehicle Routing in a Refuse Collection System
International Journal of Sustainable Engineering, Vol. 4, No. 3, pp. 215-223. (SCOPUS)
36. Ma, Y.-S., Jun, H.-B., Kim, H.-W., and Lee, D.-H.
Disassembly Process Planning Algorithms for End-of-Life Product Recovery and Environmentally Conscious Disposal
International Journal of Production Research, Vol. 49, No. 23, pp. 7007-7027. (SCI)
37. Shim, I.-S., Kim, H.-C., Doh, H.-H., and Lee, D.-H.
A Two-Stage Heuristic for Single Machine Capacitated Lot-Sizing and Scheduling with Sequence-dependent Setup Costs
Computers & Industrial Engineering, Vol. 61, No. 4, pp. 920-929. (SCIE)
38. Yu, J.-M., Kim, J.-S., and Lee, D.-H.
Scheduling algorithms to minimise the total family flow time for job shops with job families
International Journal of Production Research, Vol. 49, No. 22, pp. 6885-6903. (SCI)
2010
39. Doh, H.-H., and Lee, D.-H.
Generic Production Planning Model for Remanufacturing Systems
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 224, No. 1, pp. 159-168. (SCI)
2009
40. Choi, H.-S., Kim, H.-W., Lee, D.-H., Yun, J., Yoon, C. Y., and Chae, K. B.
Scheduling Algorithms for Two-Stage Reentrant Hybrid Flow Shops: Minimizing Makespan under the Maximum Allowable Due-dates
International Journal of Advanced Manufacturing Technology, Vol. 42, No. 9, pp. 963-973. (SCIE)
41. Kim, H.-J., Lee, D.-H., Xirouchakis, P., and Kwon, O.-K.
A Branch and Bound Algorithm for Disassembly Scheduling with Assembly Product Structure
Journal of the Operational Research Society, Vol. 60, No. 3, pp. 419-430. (SCI)
42. Kim, H.-W., and Lee, D.-H.
Heuristics for Reentrant Hybrid Flow Shops with Unrelated Parallel Machines
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 223, No. 4, pp. 433-442. (SCI)
43. Kim, J.-G., and Lee, D.-H.
Algorithms for Common Due-Date Assignment and Sequencing in a Single Machine with Sequence-Dependent Setup Times
Journal of the Operational Research Society, Vol. 60, No. 9, pp. 1264-1272. (SCI)
2008
44. Kim, J.-S., and Lee, D.-H.
Heuristic Algorithms for Capacitated Collection Network Design in Reverse Logistics
Management Science and Financial Engineering. Vol. 12, No. 2, pp. 45-66. (SCOPUS)
45. Park, S.-H., and Lee, D.-H.
Sequencing Algorithms for Multiple Arc-Welding Robots Considering Thermal Distortion
International Journal of Production Research, Vol. 46, No. 17, pp. 4751-4767. (SCI)
2007
46. Kim, H.-J., Lee, D.-H., and Xirouchakis, P.
Disassembly Scheduling: Literature Review and Further Research Directions
International Journal of Production Research. Vol. 45, No. 18&19, pp. 4465 - 4484. (SCI)
47. Kim, S.-I., Choi, H.-S., and Lee, D.-H.
Scheduling Algorithms for Parallel Machines with Sequence-dependent Setup and Distinct Ready times: Minimizing Total Tardiness
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 221, No. 6, pp. 1087-1096. (SCI)
2006
48. Choi, S.-H., Park, M.-W., Lee, D.-H., Jeong, K.-C., Kim, J.-G., and Lee, G.-C.
A Conceptual Framework of an Advanced Planning and Scheduling System for Printed Circuit Board Manufacturing Lines
Asia Pacific Management Review, Vol. 11, No. 3, pp. 133-139. (SCOPUS)
49. Jeon, H.-B., Kim, J.-G., Kim, H.-J., and Lee, D.-H.
A Two-Stage Heuristic for Disassembly Scheduling with Capacity Constraints
Management Science and Financial Engineering, Vol. 12, No. 1, pp. 95-112. (SCOPUS)
50. Kim, H.-J., Lee, D.-H., and Xirouchakis, P.
A Two-Phase Heuristic for Disassembly Scheduling with Multiple Product Types and Parts Commonality
International Journal of Production Research, Vol. 44, No.1, pp. 195-212. (SCI)
51. Kim, H.-J., Lee, D.-H., and Xirouchakis, P.
A Lagrangean Heuristic Algorithm for Disassembly Scheduling with Capacity Constraints
Journal of the Operational Research Society, Vol. 57, No. 10, pp. 1231-1240. (SCI)
52. Kim, J.-G., Jeon, H.-B., Kim, H.-J., Lee, D.-H., and Xirouchakis, P.
Disassembly Scheduling with Capacity Constraints: Minimizing the Number of Products Disassembled
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, Vol. 220, No. 9, pp. 1473-1481. (SCI)
53. Kim, S.-I., Choi, H.-S., and Lee, D.-H.
Tabu Search Algorithms for Parallel Machine Scheduling with Sequence-Dependent Setup and Ready Times
International Conference on Computational Science and Its Applications, pp. 728-73.
2005
54. Kim, H.-J., Kim, Y.-D. and Lee, D.-H.
Scheduling for an Arc Welding Robot considering Heat-caused Distortion
Journal of the Operational Research Society, Vol. 56, No. 1, pp. 39-50. (SCI)
55. Kim, H.-J., Lee, D.-H., and Xirouchakis, P.
A Lagrangean Relaxation Approach for Capacitated Disassembly Scheduling
Computational Science and Its Applications–ICCSA 2005, pp. 824-824.
56. Kim, H.-J., Lee, D.-H., and Xirouchakis, P.
An Optimal Algorithm for Disassembly Scheduling with Assembly Product Structure
Advances in Artificial Intelligence, pp. 235-248.
57. Kim, J.-G., Jeon, H.-B., Kim, H.-J., Lee, D.-H. and Xirouchakis, P.
Capacitated Disassembly Scheduling: Minimizing the Number of Products Disassembled
Computational Science and Its Applications–ICCSA 2005, pp. 1-8.
58. Lee, D.-H.
Disassembly Scheduling for Products with Assembly Structure
Management Science and Financial Engineering, Vol. 11, No.1, pp. 63-78. (SCOPUS)
2004
59. ee, D.-H., Kiritsis, D., and Xirouchakis, P.
An Iterative Approach to Operation Selection and Sequencing in Process Planning
International Journal of Production Research, Vol. 42, No. 22, pp. 4745-4766. (SCI)
60. Lee, D.-H., and Xirouchakis, P.
A Two-Stage Heuristic for Disassembly Scheduling with Assembly Product Structure
Journal of the Operational Research Society, Vol. 55, No. 3, pp. 287-297. (SCI)
61. Lee, D.-H., Kim, H.-J., Choi, G. and Xirouchakis, P.
Disassembly Scheduling: Integer Programming Models
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, Vol. 218, No. 10, pp. 1357-1372. (SCI)
2003
62. Kang, J.-G., Lee, D.-H. and Xirouchakis, P.
Disassembly Sequencing with Imprecise Data: a Case Study
International Journal of Industrial Engineering-Theory Applications and Practice, Vol.10, No. 4, pp. 407-412. (SCIE)
63. Kim, H.-J., Lee, D.-H., Xirouchakis, P., and Züst, R.
Disassembly Scheduling with Multiple Product Types
CIRP Annals-Manufacturing Technology, Vol. 52, No. 1, pp. 403-406. (SCIE)
2002
64. Lee, D.-H., Kiritsis, D., and Xirouchakis, P.
Operation Sequencing in Nonlinear Process Planning: Local Search Heuristics
Studies in Informatics and Control, Vol. 11, No. 1, pp. 75-90. (SCIE)
65. Lee, D.-H., Xirouchakis, P., and Zust, R.
Disassembly Scheduling with Capacity Constraints
CIRP Annals-Manufacturing Technology, Vol. 51, No. 1, pp. 387-390. (SCIE)
2001
66. Kang, J.-G., Kraftsik, G.E.O.R.G.E.S., Lee, D.-H., and Xirouchakis, P.A.U.L.
A Simulation Study on Telephone Remanufacturing Processes
International Journal of Environmentally Conscious Design & Manufacturing, Vol. 10, No. 4, pp. 9-22.
67. Kang, J.-G., Lee, D.-H., Xirouchakis, P., and Persson, J.G.
Parallel Disassembly Sequencing with Sequence-Dependent Operation Times,
CIRP Annals-Manufacturing Technology, Vol. 50, No. 1, pp. 343-346. (SCIE)
68. Kim, Y.-D., Lee, D.-H., and Yoon, C.-M.
Two-Stage Heuristic Algorithms for Part Input Sequencing in Flexible Manufacturing Systems
European Journal of Operational Research, Vol. 133, No. 3, pp. 624-634. (SCIE)
69. Lee, D.-H., Kang, J.-G., and Xirouchakis, P.
Disassembly Planning and Scheduling: Review and Further Research
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, Vol. 215, No.5, pp. 695-709. (SCI)
70. Lee, D.-H., Kiritsis, D., and Xirouchakis, P.
Branch and Fathoming Algorithms for Operations Sequencing in Process Planning
International Journal of Production Research, Vol. 39, No. 8, pp. 1649-1669. (SCI)
71. Lee, D.-H., Kiritsis, D., and Xirouchakis, P.
Search Heuristics for Operation Sequencing in Process Planning
International Journal of Production Research, Vol. 39, No. 16, pp. 3771-3788. (SCI)
72. Neuendorf, K.P., Lee, D.-H., Kiritsis, D., and Xirouchakis, P.
Disassembly Scheduling with Parts Commonality Using Petri-Nets with Timestamps
Fundamenta Informaticae, Vol. 47, No. 3-4, pp. 295-306. (SCIE)
2000
73. Kim, T.-G., Kim, Y.-D., and Lee, D.-H.
Simulated Annealing Algorithms for Locating Pickup and Delivery Points in Automated Guided Vehicle Systems
Journal of Engineering Valuation and Cost Analysis
74. Lee, D.-H. and Kim, Y.-D.
Loading Algorithms for Flexible Manufacturing Systems with Partially Grouped Machines
IIE Transactions, Vol. 32, No. 1, pp. 33-47. (SCI)
1999
75. Lee, D.-H., and Kim, Y.-D.
Scheduling Algorithms for Flexible Manufacturing Systems with Partially Grouped Machines
Journal of Manufacturing Systems, Vol. 18, No. 4, pp. 301. (SCIE)
1998
76. Kim, Y.-D., Lee, D.-H., K, J.-U., and Roh, H.-K.
A Simulation Study on Lot Release Control, Dispatching and Batch Scheduling in Semiconductor Wafer Fab
Journal of Manufacturing Systems, Vol. 17, No. 22, pp. 107. (SCI)
77. Lee, D.-H., and Kim, Y.-D.
A Multi-Period Order Selection Problem in Flexible Manufacturing Systems
Journal of the Operational Research Society, Vol. 49, No.3, pp. 278-286. (SCI)
78. Lee, D.-H., and Kim, Y.-D.
Iterative Procedures for the Multi-Period Order Selection and Loading Problems in Flexible Manufacturing Systems
International journal of production research, Vol. 36, No. 10, pp. 2653-2668. (SCI)
1997
79. Lee, D.-H., Lim, S.-K., Lee, G.-C., Jun, H.-B. and Kim, Y.-D.
Multi-Period Part Selection and Loading Problems in Flexible Manufacturing System
Computers & industrial engineering, Vol. 33, No. 3-4, pp. 541-544. (SCIE)
1996
80. Lee, D.-H., and Kim, Y.-D.
Part-Mix Allocation in a Hybrid Manufacturing System with a Flexible Manufacturing Cell and a Conventional Jobshop
International journal of production research, Vol. 34, No. 5, pp. 1347-1360. (SCI)