WINTER 2018
Doh, Hyoung Ho
Ph.D
1. Robust production planning and control for multi-stage systems with flexible final assembly lines 02.06
Shin, Jeong Hoon
ph.D
1. A bi-objective identical parallel machine scheduling problem with controllable processing times: a just in time approach 02.06
Choi, Haneol
M.S
1. solving the airline crew recovery problem by a genetic algorithm with local improvement 02.27
Cho, Yooney
M.S
1. A proactive job-shop scheduling strategy driven by real-time situation data. 02.20
Choi, Haneol
M.S
1. A network model for airline cabin crew scheduling 01.23
Cho, Yooney
M.S
1. Rescheduling frequency in an FMS with uncertain processing times and unreliable machines 01.23
2. Production scheduling/rescheduling in flexible manufacturing 01.09

SUMMER 2018
Doh, HyoungHo
Ph.D
1. Multi commodity, multi vehicle pick-up and delivery problem with time window 07.24
Shin, Jeong Hoon
Ph.D
1. on the robustness of using balanced part mix ratios to determine cyclic part input sequences into flexible flow systems 08.21
Cho, yooney
M.S
1. A variable neighbourhood search for hybrid flow-shop scheduling problem with rework and set-up times 07.11
Choi, Haneol
M.S
1. A proactive crew recovery decision support tool for commercial airlines during irregular operations 07.11
2. An integrated decision support tool for airlines schedule recovery during irregular operations 07.24
3. Airline recovery scheduling problems 08.14
Cho, Yooney
M.S
1. Production control policy for tandem workstations with constant service times and queue time constraints 08.14
2. Integer programming-based real time dispatching heuristic for wet etch station at wafer fabrication 08.21
Choi, Haneol
M.S
1. A math-heuristic algorithm for the integrated air service recovery. 08.21