WINTER 2018
Doh, Hyoung Ho
Ph.D
1. Robust production planning and control for multi-stage systems with flexible final assembly lines 02.06
Shin, Jeong Hoon
ph.D
1. A bi-objective identical parallel machine scheduling problem with controllable processing times: a just in time approach 02.06
Choi, Haneol
M.S
1. solving the airline crew recovery problem by a genetic algorithm with local improvement 02.27
Cho, Yooney
M.S
1. A proactive job-shop scheduling strategy driven by real-time situation data. 02.20
Choi, Haneol
M.S
1. A network model for airline cabin crew scheduling 01.23
Cho, Yooney
M.S
1. Rescheduling frequency in an FMS with uncertain processing times and unreliable machines 01.23
2. Production scheduling/rescheduling in flexible manufacturing 01.09