2024
1.

Cho, Y., Kim, H.-I., Kim, Y.-R., Yu, S.-G., Kim, B.-H., and Lee, D.-H.

A scheduling mechanism for hybrid flow shops with reworks under general queue time limits
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, SCIE (Online Published)

2.

Doh, H.-H. and Lee, D.-H.

Dynamic lot-sizing for remanufacturing systems with multi-level structured products and components commonality
Applied Mathematical Modelling 125, 789-808 SCIE (2024.01)

3.

Jung, H.-B., Kim, H.-I. and Lee, D.-H.

Team orienteering with possible multiple visits: Mathematical model and solution algorithms
Computers and Industrial Engineering, 190: 110074, SCIE (2024.04)

2023
4.

Choi, Y.-H., Kim, H.-I. and Lee, D.-H.

Disassembly leveling and lot-sizing for multiple product types with uncertain component demands
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture 237(11): 1660-1670, SCIE (2023.11)

5.

Kim, H.-I. and Lee, D.-H.

Scheduling algorithms for multi-stage flow shops with reworks under overlapped queue time limits
International Journal of Production Research 61(20): 6809-6822, SCIE (2023.11)

2022
6.

Doh, H.-H. and Lee, D.-H.

Integrated disassembly and reprocessing lotsizing for multi-level structured products in remanufacturing systems
Engineering Optimization 54(9): 1476-1493, SCIE (2022.09)

2021
7.

Zeid, I. B., Doh, H.-H., Shin, J.-H., and Lee, D.-H.

Fast and meta heuristics for part selection in flexible manufacturing systems with controllable processing times
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 235(4): 650-662. SCI (2021.03)

2020
8.

Lee, D.-K., Shin, J.-H., and Lee, D.-H.

Operations scheduling for an advanced flexible manufacturing system with multi-fixturing pallets
Computers & Industrial Engineering, 144: 106496 SCIE (2020.04)

9.

Shin, J.-H., Yu, J.-M., Doh, H.-H., Kim, H.-W., and Lee, D.-H.

Batching and Scheduling for a Single-machine Flexible Machining Cell with Multi-Fixturing Pallets and Controllable Processing Times
International Journal of Production Research, Vol. 58, No. 3, pp. 863-877. SCI (2020.02)

2019
10.

Kim, H.-W., Joo, G.-H., and Lee, D.-H.

Multi-period Heterogeneous Vehicle Routing considering Carbon Emission Trading
International Journal of Sustainable Transportation, Vol. 13, No. 5, pp. 340-349. SSCI (2019.05)

11.

Kim, J.-S., and Lee, D.-H.

Collection Network Design with Capacity Planning in Reverse Logistics: Static and Restricted Dynamic Models
Engineering Optimization, Vol. 51, No. 8, pp. 1430-1445. SCIE (2019.08)

12.

Zhou, Y.-D., Shin. J.-H., and Lee, D.-H.

Loading and Scheduling for Flexible Manufacturing Systems with Controllable Processing Times
Engineering Optimization, Vol. 51, No. 3, pp. 412-426. SCIE (2019.03)

2018
13.

Cho, Y.-H., Doh, H.-H., and Lee, D.-H.

Mathematical Model and Solution Algorithms for Capacitated Dynamic Lot-sizing in Remanufacturing Systems
Industrial Engineering & Management Systems, Vol. 17, No. 1, pp. 1-13. SCOPUS (2018.03)

14.

Kim, D.-H., Doh, H.-H., and Lee, D.-H.

Multi-period Disassembly Levelling and Lot-sizing for Multiple Product Types with Parts Commonality
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 232, No. 5, pp. 867-878. SCI (2018.04)

15.

Kim, H.-W., and Lee, D.-H.

A Sample Average Approximation Algorithm for Selective Disassembly Sequencing with Abnormal Disassembly Operations and Random Operation Times
The International Journal of Advanced Manufacturing Technology, Vol. 96, No. 1-4, pp. 1341-1354. SCIE (2018.04)

16.

Kim, H.-W., Park, C., and Lee, D.-H.

Selective Disassembly Sequencing with Random Operation Times in Parallel Disassembly Environment
International Journal of Production Research, Vol. 56, No. 24, pp. 7243-7257. SCI (2018.12)

17.

Ulugov, A., Shin, J.-H., and Lee, D.-H.

Common Due-date Assignment and Scheduling on a Single Machine with Sequence-dependent Setups and Discretely Controllable Job Processing Times
International Journal of Industrial Engineering: Theory, Applications and Practice, Vol. 25, No. 5, pp. 580-589. SCIE (2018.10)

18.

Yu, J.-M., and Lee, D.-H.

Solution Algorithms to Minimize the Total Family Tardiness for Job Shop Scheduling with Job Families
European Journal of Industrial Engineering, Vol. 12, No. 1, pp. 1-23. SCIE (2018.01)

19.

Yu, J.-M., and Lee, D.-H.

Scheduling Algorithms for Job-shop-type Remanufacturing Systems with Component Matching Requirement
Computers & Industrial Engineering, Vol. 120, pp. 266-278. SCIE (2018.06)

2017
20.

Kim, H.-W., and Lee, D.-H.

An Optimal Algorithm for Selective Disassembly Sequencing with Sequence-dependent Setups in Parallel Disassembly Environment
International Journal of Production Research, Vol. 55, No. 24, pp. 7317-7333. SCI (2017.12)

21.

Kim, J.-M., Zhou, Y.-D., and Lee, D.-H.

Priority Scheduling to Minimize the Total Tardiness for Remanufacturing Systems with Flow-shop-type Reprocessing Lines
The International Journal of Advanced Manufacturing Technology, Vol. 91, No. 9-12, pp. 3697-3708. SCIE (2017.08)

22.

Kim, J.-S., Park, J.-H., and Lee, D.-H.

Iterated Greedy Algorithms to Minimize Total Family Flow Time for Job Shop Scheduling with Job Families and Sequence-dependent Setups
Engineering Optimization, Vol. 49, No. 10, pp. 1719-1732. SCIE (2017.10)

23.

Yu, J.-M., Huang, R., and Lee, D.-H.

Iterative Algorithms for Batching and Scheduling to Minimize the Total Job Tardiness in Two-stage Hybrid Flow Shops
International Journal of Production Research, Vol. 55, No. 11, pp. 3266-3282. SCI (2017.06)

2016
24.

Doh, H.-H., Yu, J.-M., Kwon, Y.-J., Suh, M.-S., and Lee, D.-H.

Priority Scheduling for a Flexible Job Shop with a Reconfigurable Manufacturing Cell
Industrial Engineering & Management Systems, Vol. 15, No. 1, pp. 11-18. SCOPUS (2016.03)

25.

Kang, K.-W., Doh, H.-H., Park, J.-H., and Lee, D.-H.

Disassembly Leveling and Lot-sizing for Multiple Product Types: a Basic Model and its Extension
The International Journal of Advanced Manufacturing Technology, Vol. 82, No. 9-12, pp. 1463-1473. SCIE (2016.02)

2015
26.

Kim, J.-S., and Lee, D.-H.

An Integrated Approach for Collection Network Design, Capacity Planning and Vehicle Routing in Reverse Logistics
Journal of the Operational Research Society, Vol. 66, No. 1, pp. 76-85. SCI (2015.01)

27.

Kim, J.-S., and Lee, D.-H.

A Case Study on Collection Network Design, Capacity Planning and Vehicle Routing in Reverse Logistics
International Journal of Sustainable Engineering, Vol. 8, No. 1, pp. 66-76. SCOPUS (2015.02)

28.

Kim, M.-G., Yu, J.-M., and Lee, D.-H.

Scheduling Algorithms for Remanufacturing Systems with Flow-Shop-Type Reprocessing Lines
International Journal of Production Research, Vol. 53, No. 6, pp. 1819-1831. SCI (2015.03)

29.

Lee, C.-W., Doh, H.-H., and Lee, D.-H.

Capacity and Production Planning for a Hybrid System with Manufacturing and Remanufacturing Facilities
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 229, No. 9, pp. 1645-1653. SCI (2015.09)

2014
30.

Yu, Z.-J., Shin, J.-H., and Lee, D.-H.

An Operation-level Dynamic Capacity Scalability Model for Reconfigurable Manufacturing Systems
International Journal of Industrial Engineering: Theory, Applications and Practice, Vol. 21, No. 6, pp. 317-326. SCIE (2014.12)

2013
31.

Doh, H.-H., Yu, J.-M., Kim, J.-S., Lee, D.-H., and Nam, S.-H.

A Priority Scheduling Approach for Flexible Job Shops with Multiple Process Plans
International Journal of Production Research. Vol. 51, No. 12, pp. 3748-3764. SCI (2013.06)

32.

Go, H., Kim, J.-S., and Lee, D.-H.

Operation and Preventive Maintenance Scheduling of Containerships: Mathematical Model and Solution Algorithm
European Journal of Operational Research, Vol. 229, No. 3, pp. 626-636. SCIE (2013.09)

33.

Han, H.-J., Yu, J.-M., and Lee, D.-H.

Mathematical Model and Solution Algorithms for Selective Disassembly Sequencing with Multiple Target Components and Sequence-Dependent Setups
International Journal of Production Research, Vol. 51, No. 16, pp. 4997-5010. SCI (2013.08)

34.

Kim, J.-G., Yu, J.-M., and Lee, D.-H.

Common Due-date Assignment and Scheduling on Parallel Machines with Sequence-dependent Setup Times
Management Science and Financial Engineering, Vol. 19, No. 1, pp. 29-36. KCI (2013.05)

35.

Kim, J.-S. and Lee, D.-H.

Designing Refuse Collection Networks under Capacity and Maximum Allowable Distance Constraints
Management Science and Financial Engineering, Vol. 19, No. 2, pp. 19-29. KCI (2013.11)

36.

Kim, J.-S., and Lee, D.-H.

A Restricted Dynamic Model for Designing Refuse Collection Networks in Reverse Logistics
Computers & Industrial Engineering, Vol. 66, No. 4, pp. 1131-1137. SCIE (2013.12)

37.

Kwon, Y.-J., Choi, Y.-J., and Lee, D.-H.

Heterogeneous Fixed Fleet Vehicle Routing Considering Carbon Emission
Transportation Research Part D: Transport and Environment, Vol. 23, pp. 81-89. SSCI/SCIE (2013.08)

38.

Lee, J.-H., Yu, J.-M., and Lee, D.-H.

A Tabu Search Algorithm for Unrelated Parallel Machine Scheduling with Sequence and Machine Dependent Setups: Minimizing Total Tardiness
The International Journal of Advanced Manufacturing Technology. Vol. 69, No. 9-12, pp. 2081-2089.SCIE (2013.12)

39.

Yu, J.-M., Doh, H.-H., Kim, J.-S., Kwon, Y.-J., Lee, D.-H., and Nam, S.-H

Input Sequencing and Scheduling for a Reconfigurable Manufacturing System with a Limited Number of Fixtures
The International Journal of Advanced Manufacturing Technology, Vol. 67, No. 1, pp. 157-169. SCIE (2013.07)

2012
40.

Jun, H.-B., Lee, D.-H., Kim, J.-G., and Kiritsis, D.

Heuristic Algorithms for Minimizing Total Recovery Cost of End-of-Life Products under Quality Constraint
International Journal of Production Research. (SCI)

41.

Kim, H.-W., Yu, J.-M., Kim, J.-S., Doh, H.-H., Lee, D.-H., and Nam, S.-H.

Loading Algorithms for Flexible Manufacturing Systems with Partially Grouped Unrelated Machines and Additional Tooling Constraints
International Journal of Advanced Manufacturing Technology, Vol. 58, No. 5-8, pp. 683-691. (SCIE)

42.

Kim, J.-G., Kim, J.-S., and Lee, D.-H.

Common Due-date Assignment and Sequencing with Sequence-dependent Setup Times: a Case Study on a Paper Remanufacturing System
Management Science and Financial Engineering, Vol. 18, No. 1, pp. 1-12. (KCI)

43.

Kim, J.-G., Kim, J.-S., and Lee, D.-H.

Fast and Meta-Heuristics for Common Due-Date Assignment and Scheduling on Parallel Machines
International Journal of Production Research. (SCI)

44.

Yu, J.-M., Doh, H.-H., Kim, H.-W., Kim, J.-S., , Lee, D.-H., and Nam, S.-H.

Iterative Algorithms for Part Grouping and Loading in Cellular Reconfigurable Manufacturing Systems
Journal of the Operational Research Society. (SCI)

2011
45.

Ahn, H. D., Lee, D.-H., and Kim, H.-J.

Solution Algorithms for Dynamic Lot-sizing in Remanufacturing Systems
International Journal of Production Research, Vol. 49, No. 22, pp. 6729-6748. (SCI)

46.

Choi, H.-S., Kim, J.-S., and Lee, D.-H.

Real-Time Scheduling for Reentrant Hybrid Flow Shops: a Decision Tree based Mechanism and its Application to a TFT-LCD line
Expert Systems with Applications, Vol. 38, No. 4, pp. 3514-3521. (SCIE)

47.

Ha, K.-W., Yu, J.-M., Park, J.-I., and Lee, D.-H.

Priority Rule based Heuristics for the Team Orienteering Problem
International Journal of Management Science, Vol. 17, No. 1, pp. 79-94. (KCI)

48.

Kim, J.-G., Kim, J.-S., and Lee, D.-H.

A Case Study on Period Vehicle Routing in a Refuse Collection System
International Journal of Sustainable Engineering, Vol. 4, No. 3, pp. 215-223. (SCOPUS)

49.

Ma, Y.-S., Jun, H.-B., Kim, H.-W., and Lee, D.-H.

Disassembly Process Planning Algorithms for End-of-Life Product Recovery and Environmentally Conscious Disposal
International Journal of Production Research, Vol. 49, No. 23, pp. 7007-7027. (SCI)

50.

Shim, I.-S., Kim, H.-C., Doh, H.-H., and Lee, D.-H.

A Two-Stage Heuristic for Single Machine Capacitated Lot-Sizing and Scheduling with Sequence-dependent Setup Costs
Computers and Industrial Engineering, Vol. 61, No. 4, pp. 920-929. (SCIE)

51.

Yu, J.-M., Kim, J.-S., and Lee, D.-H.

Scheduling Algorithms to Minimize the Total Family Flow Time for Job Shops with Job Families
International Journal of Production Research, Vol. 49, No. 22, pp. 6885-6903. (SCI)

2010
52.

Doh, H.-H. and Lee, D.-H.

Generic Production Planning Model for Remanufacturing Systems
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 224, pp. 159-168. (SCI)

2009
53.

Choi, H.-S. and Lee, D.-H.

Scheduling Algorithms to Minimize the Number of Tardy Jobs in Two- Stage Hybrid Flow Shops
Computers and Industrial Engineering, Vol. 56, No. 1, pp. 113-120. (SCIE)

54.

Choi, H.-S., Kim, H.-W., Lee, D.-H., Yun, J., Yoon, C. Y., and Chae, K. B.

Scheduling Algorithms for Two-Stage Reentrant Hybrid Flow Shops: Minimizing Makespan under the Maximum Allowable Due-dates
International Journal of Advanced Manufacturing Technology, Vol. 42, pp. 963-973. (SCIE)

55.

Kim, H.-J., Lee, D.-H., Xirouchakis, P., and Kwon, O.-K.

A Branch and Bound Algorithm for Disassembly Scheduling with Assembly Product Structure
Journal of the Operational Research Society, Vol. 60, pp. 419-430. (SCI)

56.

Kim, H.-W. and Lee, D.-H.

Heuristics for Reentrant Hybrid Flow Shops with Unrelated Parallel Machines
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 223, pp. 433-442. (SCI)

57.

Kim, J.-G. and Lee, D.-H

Algorithms for Common Due-Date Assignment and Sequencing in a Single Machine with Sequence-Dependent Setup Times
Journal of the Operational Research Society, Vol. 60, pp. 1264-1272. (SCI)

2008
58.

Park, S.-H. and Lee, D.-H.

Sequencing Algorithms for Multiple Arc-Welding Robots Considering Thermal Distortion
International Journal of Production Research, Vol. 46, No. 17, pp. 4751-4767. (SCI)

2007
59.

Kim, H.-J., Lee, D.-H., and Xirouchakis, P.

Disassembly Scheduling: Literature Review and Further Research Directions
International Journal of Production Research. Vol. 45, No. 18&19, pp. 4465 - 4484. (SCI)

60.

Kim, S.-I. , Choi, H.-S., and Lee, D.-H.

Scheduling Algorithms for Parallel Machines with Sequence-dependent Setup and Distinct Ready times: Minimizing Total Tardiness
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 221, No. 6, pp. 1087-1096. (SCI)

2006
61.

Choi, S.-H., Park, M.-W., Lee, D.-H., Jeong, K.-C., Lim, S.-K., Kim, J.-G., and Lee, G.-C.

A Conceptual Framework of an Advanced Planning and Scheduling System for Printed Circuit Board Manufacturing Lines
Asia Pacific Management Review, Vol. 11, pp. 133-140.

62.

Jeon, H.-B., Kim, J.-G., Kim, H.-J., and Lee, D.-H.

A Two-Stage Heuristic for Disassembly Scheduling with Capacity Constraints
International Journal of Management Science, Vol. 12, pp. 95-112

63.

Kim, H.-J., Lee, D.-H., and Xirouchakis, P.

A Two-Phase Heuristic for Disassembly Scheduling with Multiple Product Types and Parts Commonality
International Journal of Production Research, Vol. 44, pp. 195-212. (SCI)

64.

Kim, H.-J., Lee, D.-H., and Xirouchakis, P.

A Lagrangean Heuristic Algorithm for Disassembly Scheduling with Capacity Constraints
Journal of the Operational Research Society, Vol. 57, pp. 1231-1240. (SCI)

65.

Kim, J.-G., Jeon, H.-B., Kim, H.-J., Lee, D.-H., and Xirouchakis, P.

Disassembly Scheduling with Capacity Constraints: Minimizing the Number of Products Disassembled
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 220, pp. 1473-1481. (SCI)

66.

Kim, S.-I. , Choi, H.-S. , and Lee, D.-H.

Tabu Search Algorithms for Parallel Machine Scheduling with Sequence-Dependent Setup and Ready Times
Lecture Notes in Computer Science, Vol. 3982, pp. 700-709. (2006.05)

2005
67.

Kim, H.-J., Kim, Y.-D., and Lee, D.-H.

Scheduling for an Arc Welding Robot considering Heat-caused Distortion
Journal of the Operational Research Society, Vol. 56, pp. 39-50. (SCI)

68.

Kim, H.-J., Lee, D.-H., and Xirouchakis, P.

A Lagrangean Relaxation Approach for Capacitated Disassembly Scheduling
Lecture Notes in Computer Science, Vol. 3483, pp. 722-732. (2005.05)

69.

Kim, H.-J., Lee, D.-H., and Xirouchakis, P.

An Optimal Algorithm for Disassembly Scheduling with Assembly Product Structure
Lecture Notes in Artificial Intelligence, Vol. 3698, pp. 235-248. (2005.09)

70.

Kim, J.-G., Jeon, H.-B., Kim, H.-J., Lee, D.-H., and Xirouchakis, P.

Capacitated Disassembly Scheduling: Minimizing the Number of Products Disassembled
Lecture Notes in Computer Science, Vol. 3483, pp. 538-547.

71.

Lee, D.-H.

Disassembly Scheduling for Products with Assembly Structure
International Journal of Management Science, Vol. 11, pp. 63-78. (2005.05)

2004
72.

Lee, D.-H., and Xirouchakis, P.

A Two-Stage Heuristic for Disassembly Scheduling with Assembly Product Structure
Journal of the Operational Research Society, Vol. 55, No. 3, pp. 287-297. (SCI)

73.

Lee, D.-H., Kim, H.-J., Choi, G. and Xirouchakis, P.

Disassembly Scheduling: Integer Programming Models
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 218, pp. 1357-1372. (SCI)

74.

Lee, D.-H., Kiritsis, D., and Xirouchakis, P.

An Iterative Approach to Operation Selection and Sequencing in Process Planning
International Journal of Production Research. Vol. 42, pp. 4745-4766. (SCI)

2003
75.

Kang, J.-G., Lee, D.-H., and Xirouchakis, P.

Disassembly Sequencing with Imprecise Data: a Case Study
International Journal of Industrial Engineering Special Issue, Vol. 10, No.4, pp. 407-412. (SCIE)

76.

Kim, H.-J., Lee, D.-H., Xirouchakis, P., and Zust, R.

Disassembly Scheduling with Multiple Product Types
CIRP Annals Manufacturing Technology, Vol. 52, No. 1, pp. 403-406. (SCIE)

2002
77.

Lee, D.-H., Kiritsis, D., and Xirouchakis, P.

Operation Sequencing in Nonlinear Process Planning: Local Search Heuristics
Studies in Informatics and Control, Vol. 11, No. 1, pp. 73-90

78.

Lee, D.-H., Xirouchakis, P., and Zust, R.

Disassembly Scheduling with Capacity Constraints
CIRP Annals Manufacturing Technology, Vol. 51, No. 1, pp. 387-390. (SCIE)

2001
79.

Kang, J.-G., Kraftsik, G., Lee, D.-H., and Xirouchakis, P.

A Simulation Study on Telephone Remanufacturing Processes
International Journal of Environmentally Conscious Design & Manufacturing. Vol. 10, No. 4, pp. 9-22

80.

Kang, J.-G., Lee, D.-H., Xirouchakis, P., and Persson, J.-G.

Parallel Disassembly Sequencing with Sequence-Dependent Operation Times
CIRP Annals Manufacturing Technology, Vol. 50, pp. 343-346. (SCIE)

81.

Kim, Y.-D., Lee, D.-H., and Yoon, C.-M.

Two-Stage Heuristic Algorithms for Part Input Sequencing in Flexible Manufacturing Systems
European Journal of Operational Research, Vol. 133, No. 3, pp. 624-634. (SCIE)

82.

Lee, D.-H., Kang, J.-G., and Xirouchakis, P.

Disassembly Planning and Scheduling: Review and Further Research
Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 215, No. 5, pp. 695-710. (2001.05) 공동(제1) SCI

83.

Lee, D.-H., Kiritsis, D., and Xirouchakis, P.

Branch and Fathoming Algorithms for Operations Sequencing in Process Planning
International Journal of Production Research, Vol. 39, No. 8, pp. 1649-1669. (2001.05) 공동(제1) SCI

84.

Lee, D.-H., Kiritsis, D., and Xirouchakis, P.

Search Heuristics for Operation Sequencing in Process Planning
International Journal of Production Research, Vol. 39, No. 16, pp. 3771-3788. (SCI)

85.

Neuendorf, K.-P., Lee, D.-H., Kiritsis, D., and Xirouchakis, P.

Disassembly Scheduling with Parts Commonality Using Petri-Nets with Timestamps
Fundamenta Informaticae, Vol. 47, No. 3-4, pp. 295-306. (SCIE)

2000
86.

Kim, J.-G., Kim, Y.-D., and Lee, D.-H.

Simulated Annealing Algorithms for Locating Pickup and Delivery Points in Automated Guided Vehicle Systems
Journal of Engineering Valuation and Cost Analysis, Vol. 3, No. 4, pp. 205-215.

87.

Lee, D.-H. and Kim, Y.-D.

Loading Algorithms for Flexible Manufacturing Systems with Partially Grouped Machines
IIE Transactions, Vol. 32, No. 1, pp. 33-47. (SCI) 

1999
88.

Lee, D.-H. and Kim, Y.-D.

Scheduling Algorithms for Flexible Manufacturing Systems with Partially Grouped Machines
Journal of Manufacturing Systems, Vol. 18, No. 4, pp. 301-309. (SCIE)

1998
89.

Kim, Y.-D., Lee, D.-H., Kim, J.-U., and Roh, H.-K.

A Simulation Study on Lot Release Control, Dispatching and Batch Scheduling in Semiconductor Wafer Fab
Journal of Manufacturing Systems, Vol. 17, No. 2, pp. 107-117. (SCIE)

90.

Lee, D.-H. and Kim, Y.-D.

Iterative Procedures for the Multi-Period Order Selection and Loading Problems in Flexible Manufacturing Systems
International Journal of Production Research, Vol. 36, No. 10, pp. 2653-2668. (SCI)

91.

Lee, D.-H. and Kim, Y.-D.

A Multi-Period Order Selection Problem in Flexible Manufacturing Systems
Journal of the Operational Research Society, Vol. 49, No. 3, pp. 278-286. (SCI)

1997
92.

Lee, D.-H., Lim, S.-K., Lee, G.-C., Jun, H.-B., and Kim, Y.-D.

Multi-Period Part Selection and Loading Problems in Flexible Manufacturing System
Computers and Industrial Engineering Special Issue, Vol. 33, Nos. 3-4, pp. 541-544. (SCIE)

1996
93.

Lee, D.-H. and Kim, Y.-D.

Part-Mix Allocation in a Hybrid Manufacturing System with a Flexible Manufacturing Cell and a Conventional Jobshop
International Journal of Production Research, Vol. 34, No. 5, pp. 1347-1360. (SCI)