2023
1.

Kim, H.-I. and Lee, D.-H.

A Two-phase Branch and Bound Algorithm for Three-machine Flow Shop Scheduling with Reworks under Overlapped Queue Time Limits
International Conference of Production Research (ICPR 2023), Cluj-Napoca, Romania

2.

Kim, H.-I. and Lee, D.-H.

Variable Neighborhood Search Algorithms for Flow Shop Scheduling with Reworks under Overlapped Queue Time Limits: Minimizing The Number of Tardy Jobs
International Congress on Logistics and SCM Systems (ICLS 2023), Seoul, Korea

3.

Kim, H.-I., Youn, A.-J., Lee, S.-H. and Lee, D.-H.

Variable Neighborhood Search Algorithms for System-level Configuration Selection in Reconfigurable Single Part Flow Lines
International Conference of Production Research (ICPR 2023), Cluj-Napoca, Romania

2022
1.

Li, X.-B., Kim, H.-I. and Lee, D.-H.

A Multi-period Capacity Scalability Planning Algorithm for Job-shop-type Reconfigurable Manufacturing Systems with Non-Decreasing Demands
Proceedings of the Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2022), Taichung, Taiwan

2.

Sim, D.-G. and Lee, D.-H.

A Greedy Randomized Adaptive Search Procedure Based Scheduling Algorithm for Scheduling of Flexible Manufacturing System with Multi-fixturing Pallets
Proceedings of the Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2022), Taichung, Taiwan

2019
1.

Shin, J.-H., and Lee, D.-H.

An Iterative Approach for Fixture Allocation and Scheduling for a Flexible Machining System with Multi-fixturing Pallets and Controllable Processing Times
Proceedings of the International Conference on the Interface between Statistics and Engineering (ICISE 2019), Seoul, Korea. (2019.06)

2018
1.

Doh, H.-H., and Lee, D.-H.

Production Planning for Remanufacturing Systems with Multi-level Product Structure
International Symposium on Precision Engineering and Sustainable Manufacturing (PRESM 2018), Sapporo, Japan. (2018.07)

2.

Lee, D.-K., Shin, J.-H., , and Lee, D.-H.

Part Loading on Pallets and Scheduling for a Flexible Machining System with Multi-fixturing Pallets
International Symposium on Precision Engineering and Sustainable Manufacturing (PRESM 2018), Sapporo, Japan. (2018.07)

3.

Zeid, I. B., Doh, H.-H., Shin, J.-H., and Lee, D.-H.

Due-date based Multi-period Part Selection for Flexible Manufacturing Systems with Controllable Processing Times
Proceedings of the International Conference on Advances in Production Management Systems (APMS 2018), Seoul, Korea. (2018.08)

2017
1.

Cho, Y.-H., Doh, H.-H., and Lee, D.-H.

Capacitated Dynamic Lot-sizing for Remanufacturing Systems with Parallel Reprocessing Workstations
Proceedings of the 5th International Conference on Advances in Engineering and Technology, Singapore. (2017.03)

2.

Zhou, Y.-D. and Lee, D.-H.

Iterative Algorithms for Loading and Scheduling for Flexible Manufacturing Systems with Controllable Processing Times
Proceedings of the Asia Pacific Industrial Engineering and Management Systems Conference, Yogjakarta, Indonesia. (2017.12)

2016
1.

Akmal, U., Shin, J.-H. and Lee, D.-H.

Common Due-date Assignment and Sequencing on a Single Machine with Sequence-dependent Setups and Discretely Controllable Job Processing Times
Proceedings of the International Conference on Industrial Engineering (IJIE2016), President Hotel, Seoul, Korea. (2016.10)

2.

Doh, H.-H. and Lee, D.-H.

Dynamic Lot-sizing for Disassembly and Reprocessing in Remanufacturing systems
Proceedings of the International Symposium on Green Manufacturing and Applications (ISGMA 2016), Bali, Indonesia. (2016.06)

3.

Kim, H.-W. and Lee, D.-H.

A Branch and Bound Algorithm for Parallel and Selective Disassembly Sequencing with Sequence-dependent Setups
Proceedings of the International Symposium on Green Manufacturing and Applications (ISGMA 2016), Bali, Indonesia. (2016.06)

4.

Shin, J.-H. and Lee, D.-H.

A Branch and Bound Algorithm for Single Machine Scheduling with Sequence-dependent Setups and Discretely Controllable Processing times
Proceedings of the International Conference on Flexible Automation and Intelligent Manufacturing (FAIM 2016), Seoul, Korea. (2016.06)

2015
1.

Doh, H.-H., Park, L.-S., and Lee, D.-H.

A Dynamic Programming Model for Disassembly and Reprocessing Lot-sizing in Remanufacturing Systems
Proceedings of the International Conference on Intelligent Materials and Manufacturing Engineering, Phuket, Thailand. (2015.01)

2.

Yu, J.-M., Kim, E.-J., and Lee, D.-H

Modified Shifting Bottleneck Algorithms to Minimize Total Family Tardiness for Job Shop Scheduling with Job Families
Proceedings of the International Conference on Intelligent Materials and Manufacturing Engineering, Phuket, Thailand. (2015.01)

2014
1.

Doh, H.-H., Yu, J.-M., Kwon, Y.-J., Shin, J.-H., Kim, H.-W., Nam, S.-H. and Lee, D.-H.

Decision Tree based Scheduling for Flexible Job Shops with Multiple Process Plans
Proceedings of the International Conference on Manufacturing, Information and Industrial Engineering, River View Hotel, Singapore. (2014.03)

2.

Kwon, Y.-J. and Lee, D.-H.

A Branch and Bound Algorithm to Minimize the Total Load Traveled for Single Vehicle Routing with Pickup and Delivery
Proceedings of the Asia Pacific Industrial Engineering and Management Systems Conference, Jeju, Korea. (2014.10)

2013
1.

Doh, H.-H. and Lee, D.-H.

Dynamic Lot Sizing for Disassembly and Reprocessing in Remanufacturing Systems
Proceedings of the International Symposium on Green Manufacturing and Applications, Honolulu, USA. (2013.06)

2.

Kim, M.-G., Yu, J.-M., and Lee, D.-H.

Solution Algorithms for Scheduling Flow-shop-type Remanufacturing Systems
Proceedings of the Asia Pacific Industrial Engineering and Management Systems Conference, Cebu, Philippines.(2013.12)

3.

Kwon, Y.-J., Yu, J.-M., Doh, H.-H., Nam, S.-H. and Lee, D.-H.

Decision Tree based Real-time Scheduling: a Decision Tree Construction Method
Proceedings of the International Symposium on Green Manufacturing and Applications, Honolulu, USA. (2013.06)

4.

Lee, C.-W., Doh, H.-H., and Lee, D.-H.

A Solution Algorithm for Capacity and Production Planning in Hybrid Systems with Manufacturing and Remanufacturing Facilities
Proceedings of the Asia Pacific Industrial Engineering and Management Systems Conference, Cebu, Philippines. (2013.12)

5.

Nam, S.-H., Shin, J.-H., Lee, D.-H., Baek, J.-Y., and Lee, S.-W.

Development of Integrated Shop Operation System in Multiple FMC Environments with Real-Time Re-scheduling Architecture
Proceedings of the International Symposium on Green Manufacturing and Applications, Honolulu, USA. (2013.06)

6.

Yu, J.-M. and Lee, D.-H.

A Branch and Bound Algorithm to Minimize the Total Family Tardiness for Job Shop Scheduling with Job Families
Proceedings of the International Symposium on Green Manufacturing and Applications, Honolulu, USA. (2013.06)

7.

Yu, Z.-J., Shin, J.-H., and Lee, D.-H.

A Multi-period Capacity Scalability Model for Reconfigurable Manufacturing Systems
Proceedings of the 17th International Conference on Industrial Engineering: Theory, Applications and Practice, Busan, South Korea. (2013.10)

2012
1.

Go, H., Kim, J.-S., and Lee, D.-H.

Mathematical Model and Solution Algorithm for Containership Operation/Maintenance Scheduling
Proceedings of the International Conference on Manufacturing Engineering, Kuala Lumpur, Malaysia. (2012.2)

2.

Han, H.-J., Yu, J.-M. and Lee, D.-H.

Selective Disassembly Sequencing with Sequence-dependent Setups for Multiple Target Components
Proceedings of the Asia Pacific Industrial Engineering and Management Systems Conference, Phuket, Thailand. (2012.12)

3.

Park, J.-H. and Lee, D.-H.

Job Shop Scheduling with Job Families and Sequence-dependent Setups: Minimizing the Total Family Flow Time
Proceedings of the Asia Pacific Industrial Engineering and Management Systems Conference, Phuket, Thailand. (2012.12) – Best Student Paper Award

4.

Yu, J.-M., Doh, H.-H., Kim, J.-S., Lee, D.-H., and Nam, S.-H.

Scheduling for a Reconfigurable Manufacturing System with Multiple Process Plans and Limited Pallets/Fixtures
Proceedings of the International Conference on Manufacturing Engineering, Kuala Lumpur, Malaysia. (2012.1)

2011
1.

Kang, K.-W., Doh, H.-H., Park, J.-H., and Lee, D.-H.

An Integrated Model and its Extension for Disassembly Leveling and Lot-sizing for Multiple Product Types
Proceedings of the IEEE/SICE International Symposium on System Integration, Kyoto, Japan.

2.

Kim, D.-H. and Lee, D.-H.

A Heuristic for Multi-Period Disassembly Leveling and Scheduling
Proceedings of the IEEE/SICE International Symposium on System Integration, Kyoto, Japan.

2010
1.

Jun, H.-B., Seo, H.-W., and Lee, D.-H.

A Heuristic Algorithm for Minimizing Total Recovery Cost of End-of-life Products under Quality constraint
Proceedings of Asian Conference on Design & Digital Engineering, Jeju, Korea. (2010.08)

2.

Kim, H.-W., Kim, J.-S., Doh-H.-H., Yu, J.-M., Lee, D.-H., and Nam, S.-H.

Algorithms for Part Grouping and Loading in Cellular Reconfigurable Manufacturing Systems
Proceedings of Asia Pacific Industrial Engineering and Management Systems Conference, Maleka, Malaysia. (2010.12)

3.

Kim, H.-W., Kim, J.-S., Yu, J.-M., Doh, H.-H., Lee, D.-H., and Nam, S.-H.

Loading Algorithms for Flexible Manufacturing Systems with Partially Grouped Unrelated Machines and Tooling Constraints
Proceedings of 2010 International Symposium on Computer, Communication, Control, and Automation, Tainan, Taiwan. (2010.05)

2009
1.

Ahn, H. D., H.-W. Kim, and Lee, D.-H.

A Dynamic Lot Sizing Model for Remanufacturing Systems
Proceedings of Asian Pacific Industrial Engineering and Management Systems Conference, Kitakyushu, Japan. (2009.12)

2.

Ha, K.-W. and Lee, D.-H.

Fast Heuristics for the Team Orienteering Problem
Proceedings of Asian Pacific Industrial Engineering and Management Systems Conference, Kitakyushu, Japan. (2009.12)

3.

Kim, J.-S. and Lee, D.-H.

A Branch and Bound Algorithm for Designing Collection Networks with Maximum Allowable Collection Distances
Proceedings of Asian Pacific Industrial Engineering and Management Systems Conference, Kitakyushu, Japan. (2009.12)

2008
1.

Choi, H.-S., Kim, J.-S., and Lee, D.-H.

A Decision Tree based Real-Time Scheduling Approach for Reentrant Hybrid Flow Shops: a Case Study on a TFT-LCD Manufacturing Line
Proceedings of Asian Pacific Industrial Engineering and Management Systems Conference, Bali, Indonesia

2.

Kim, J.-G., Kim, H.-W., and Lee, D.-H.

Common Due-Date Assignment and Sequencing on Parallel Machines with Sequence-Dependent Setup Times
Proceedings of Asian Pacific Industrial Engineering and Management Systems Conference, Bali, Indonesia

3.

Yu, J.-M. and Lee, D.-H.

Scheduling Algorithms for Job Shops with Job Families: Minimizing the Sum of the Maximum Family Flow Times
Proceedings of the International Conference on Computers and Industrial Engineering (ICC&IE 2008), Beijing, China.

2007
1.

Choi, H.-S. , Kim, J.-G., and Lee, D.-H.

Algorithms for Two-Stage Hybrid Flow Shop Scheduling: Minimizing the Number of Tardy Jobs
Proceeding of the International Conference on Statistics, Mathematics and Related Fields, Honolulu, USA. (2007.01)

2.

Choi, H.-S., Kim, J.-S., and Lee, D-H.

Scheduling Algorithms to Minimize the Number of Tardy Jobs in Multi-Stage Hybrid Flow Shops
Proceedings of the 8th International Conference on Operations and Quantitative Management, Bangkok, Thailand. (2007.10)

3.

Kim, J.-D., Choi, H.-S., and Lee, D.-H.

Vehicle Routing in a Refuse Collection System: a case Study
Proceedings of the International Conference on Computational Science and its Applications (ICCSA 2007), Kuala Lumpur, Malaysia. (2007.8)

4.

Kim, J.-G., Cho, B.-M., and Lee, D.-H.

A Case Study on Period Vehicle Routing in a Refuse Collection System
Proceedings of the 8th International Conference on Operations and Quantitative Management, Bangkok, Thailand. (2007.10)

5.

Kim, J.-S., Lee, G.-B., and Lee, D.-H.

Heuristic Algorithms for Designing Capacitated Collection Networks in Reverse Logistics
Asian Pacific Industrial Engineering and Management Systems Conference, Kaohsiung, Taiwan. (2007.12)

6.

Kwon, Y.-J., Kim, J.-G., Seo, J. , Lee, D.-H,, and Kim, D.-S.

A Tabu Search Algorithm using the Voronoi Diagram for the Capacitated Vehicle Routing Problem
Proceedings of the International Conference on Computational Science and its Applications (ICCSA 2007), Kuala Lumpur, Malaysia. (2007.8)

2006
1.

Cho, B.-M. and Lee, D.-H.

A Heuristic Algorithm for the Period Vehicle Routing Problem: Minimizing the Fleet Size
Proceeding of the Asian Pacific Industrial Engineering and Management Systems Conference, Bangkok, Thailand. (2006.12)

2.

Kim, J.-G. and Lee, D.-H.

Common Due-Date Assignment and Sequencing in a Single Machine with Sequence-Dependent Setup Times
Proceeding of the Annual International Conference on Industrial Engineering Theory, Applications and Practice, Nagoya, Japan (2006.10)

3.

Kim, S.-I. , Choi, H.-S. , and Lee, D.-H.

Tabu Search Algorithms for Parallel Machine Scheduling with Sequence-Dependent Setup and Ready Times
Proceedings of the International Conference on Computational Science and its Applications (ICCSA 2006), Glasgow, United Kingdom. (2006.5)

2005
1.

Kim, H.-J., Lee, D.-H., and Xirouchakis, P.

A Lagrangean Relaxation Approach for capacitated Disassembly Scheduling
Proceeding of the International Conference on Computational Science and its Applications (ICCSA 2005) , Suntec city, Singapore. (2005.5)

2.

Kim, H.-J., Lee, D.-H., and Xirouchakis, P.

An Optimal Algorithm for Disassembly Scheduling with Assembly Product Structure
Proceeding of the German Conference on Artificial Intelligence, Koblenz, Germany. (2005.10)

3.

Kim, J.-G., Jeon, H.-B., Kim, H.-J., Lee, D.-H., and Xirouchakis, P.

Capacitated Disassembly Scheduling: Minimizing the Number of Products Disassembled
Proceeding of the International Conference on Computational Science and its Applications (ICCSA 2005), Suntec city, Singapore. (2005.5)

2004
1.

Choi,. S.-H., Park, M.-W., Lee, D.-H., Jeong, K.-C., Lim, S.-K., Kim, J.-G., and Lee, G. C.

A Conceptual Framework of an Advanced Planning and Scheduling System for Printed Circuit Board Manufacturing Lines
Proceedings of the 10th Asia Pacific Management Conference, Daejon, Korea. (2004.10)

2.

Kim, H.-J., Lee, D.-H. , and Xirouchakis, P.

Two-Level Disassembly Scheduling with Time-Variant Disassembly Operation Costs
Proceedings of the 10th Asia Pacific Management Conference, Daejon, Korea. (2004.10)

3.

Kim, J.-G., Lee, D.-H., Choi, S.-H., Ahn, B.

Dynamic Lot-Sizing with Stepwise Transportation Costs
Proceedings of the 10th Asia Pacific Management Conference, Daejon, Korea. (2004.10)

4.

Sakara, D.., Kiritsis, D., Lee, D.-H., and Xirouchakis, P.

An Extended Two-level Coloured Petri Net-based Modelling Methodology for Automated Manufacturing Systems
Proceedings of the International IMS form 2004, Villa Erba - Cernobbio - Lake Como, Italy. (2004.05)

2003
1.

Kim, H.-J., Lee, D.-H. , and Xirouchakis, P.

Two-Level Disassembly Scheduling: An Exact Algorithm
2003 INFORMS Annual Meeting, Atlanta, USA. (2003.10)

2.

Kim, H.-J., Lee, D.-H. , Xirouchakis, P., and Zust, R.

Disassembly Scheduling with Multiple Product Types
2003 General Assembly of CIRP, Montreal, Canada. (2003.08)

2002
1.

Kang, J.-G., Lee, D.-H., and Xirouchakis, P.

Disassembly Sequencing with Imprecise Data: A Case Study
Proceedings of the 7th International Conference on Industrial Engineering, Busan, South Korea. (2002.10)

2.

Lee, D.-H. , Xirouchakis, P., and Zust, R.

Disassembly Scheduling with Capacity Constraints
2002 General Assembly of CIRP, San Sebastian, Spain. (2002.08)

2001
1.

Kang, J.-G., Lee, D.-H., Xirouchakis, P., and Persson, J.-G.

Parallel Disassembly Sequencing with Sequence-Dependent Operation Times
General Assembly of CIRP, Nancy, France. (2001.08)

2000
1.

Kiritsis, D., Goossenaerts, J., Mill, F., Raupach, C., and Lee, D.-H.

Modeling and Simulation of Manufacturing Life Cycles
Joint Paper for IMS-WG Cluster 2, Proceedings of Advanced Summer Institute Conference (ASI 2000), Bordeaux, France. (2000.09)

2.

Lee, D.-H., Kiritsis, D., and Xirouchakis, P.

Enumeration Algorithms for Operations Sequencing in Process Planning
Proceedings of Advanced Summer Institute Conference (ASI 2000), Bordeaux, France. (2000. 09)

3.

Lee, D.-H., Kiritsis, D., and Xirouchakis, P.

Simulated Annealing Algorithms for Operations Sequencing in Process Planning
Proceedings of International Conference on Computers and Industrial Engineering (ICC&IE 2000), Beijing, China. (2000.10)

4.

Neuendorf, K.-P., Lee, D.-H., Kiritsis, D., and Xirouchakis, P.

Disassembly Scheduling with Parts Commonality Using Petri-Nets with Timestamps
Proceedings of the Workshop for Concurrency, Specification, and Programming (CS&P 2000), Berlin, Germany. (2000.10)

1998
1.

Kim, J.-G., Kim, Y.-D., and Lee, D.-H.

Simulated Annealing Algorithms for Locating Pickup and Delivery Points in Automated Guided Vehicle Systems
Proceedings of the first Korea-Japan Joint Conference on Industrial Engineering and Management, KAIST, Daejon, South Korea. (1998.10)

1996
1.

Lee, D.-H., Lim, S.-K., Lee, G.-C., Jun, H.-B., and Kim, Y.-D.

Multi-Period Part Selection and Loading Problems in Flexible Manufacturing System
Proceedings of the International Conference on Computers and Industrial Engineering (ICC&IE 1996), Kyungju, South Korea. (1996.10)