[ WINTER 2025]
[ SUMMER 2025]
1. | [A] Bi-objective optimization of integrating configuration generation and scheduling for reconfigurable flow lines using NSGA-Ⅱ [B] Mixed integer programming models for concurrent configuration design and scheduling in a reconfigurable manufacturing system [C] A multi-objective particle swarm optimisation for integrated configuration design and scheduling in reconfigurable manufacturing system ![]() | 07.15 |
Lee, Min Seo - M.S
1. | Parallel batch processing machines scheduling in cloud manufacturing for minimizing total service completion time ![]() | 08.05 |
Moon, Hyeon Ji - M.S
1. | Literature on dynamic configuration selection for reconfigurable flow lines ![]() | 07.21 |
Shim, Hyun A - M.S.
1. | An improved iterated greedy algorithm for the distributed hybrid flow shop scheduling problem ![]() | 08.05 |