2024
1.

Li, X., Kim, H.-I. and Lee, D.-H.

Capacity Scalability Planning Algorithms for Job-shop-type Reconfigurable Manufacturing Systems with Dynamic Demands
Journal of the Korean Institute of Industrial Engineers (대한산업공학회지), Vol. 50, No. 3. pp. 157-172. (KCI)

2021
1.

Jang, J.-M., Kim, H.-J., Son, D.-H., and Lee, D.-H.

A Heuristic Procedure for Service-Parts Lot-Sizing with Disassembly Option
Journal of Society of Korea Industrial and Systems Engineering (한국산업경영시스템학회지), Vol. 44, No. 2, pp. 24-35.

2020
1.

Yu, J.-M., and Lee, D.-H.

Due-date based Scheduling Algorithms for Remanufacturing Systems with Job-shop-type Reprocessing shop and Parallel Reassembly Workstations
Journal of the Research Institute of Industrial Sciences (산업과학연구소 논문집) No. 68, pp. 53-66.

2018
1.

Shin, J.-H., Yu, J.-M., Doh, H.-H., Kim, H.-W. and Lee, D.-H.

Bi-criterion Scheduling for a Flexible Machining Cell with Multi-fixturing Pallets and Controllable Processing Times
Journal of Korean Institute of Industrial Engineers (대한산업공학회지), Vol. 44, No. 1. pp. 38-46.

2016
1.

Lee, C.-W., Yu, J.-M. and Lee, D.-H.

A New Dispatching Rule for Single Machine Sequencing to Minimize the Total Weighted Tardiness
Journal of the Research Institute of Industrial Sciences (산업과학연구소 논문집), Vol. 64, pp. 65-69.

2015
1.

Yu, J.-M., Doh, H.-H., Kwon, Y.-J., Shin, J.-H., Kim, H.-W., Nam, S.-H. and Lee, D.-H.

Decision Tree based Scheduling for Static and Dynamic Flexible Job Shops with Multiple Process Plans
Journal of the Korean Society for Precision Engineering (한국정밀공학회지), Vol. 32, No. 1, pp. 25-37. KCI (2015.01)

2013
1.

Yun, J.-S., Nam, S., Baek, J.-Y., Kwon K.-E. Lee, D.-H. and Lee, S.-W.

Process Management Systems for Integrated Real-Time Shop Operations in Heterogeneous Multi-Cell Based Flexible Manufacturing Environment
Journal of the Korean Society of Manufacturing Technology Engineers (한국생산제조학회지), Vol.22, No. 2, pp. 281~286. KCI (2013.06)

2012
1.

Doh, H.-H., Yu, J.-M., Kim, H.-C., Shim. I.-S. and Lee, D.-H.

A Case Study on Capacitated Lot-sizing and Scheduling in a Paper Remanufacturing System
Journal of Korea Industrial and Systems Engineering. (KCI)

2011
1.

Ha, K.-W., Yu, J.-M., Park, J.-I., and Lee, D.-H.

Priority Rule based Heuristics for the Team Orienteering Problem
International Journal of Management Science, Vol. 17, pp. 79-94. (KCI)

2.

Lee, D.-H., Kim, J.-S., Kim, H.-W., Doh, H.-H., Yu, J.-M., and Nam, S.-H.

A Scenario based Framework for System Setup and Scheduling in Reconfigurable Manufacturing Systems
Journal of the Korean Society for Precision Engineering, Vol. 28, No. 3, pp. 339-348. (KCI)

2010
1.

Kim, J.-S., Choi, H.-S., and Lee, D.-H.

Search Heuristics for Capacitated Refuse Collection Network Design in Reverse Logistics
Journal of Korea Industrial and Systems Engineering, Vol. 33, pp. 41-50. (KCI)

2009
1.

Choi, H.-S., Kim, H.-W., and Lee, D.-H.

Surrogate Objective based Search Heuristics to Minimize the Number of Tardy Jobs for Multi-Stage Hybrid Flow Shop Scheduling
Journal of the Korean Institutes of Industrial Engineers.(SCI) (2009.12)

2.

Lee, D.-H.

Operations Management in Remanufacturing: Framework and Literature Review
Journal of the Research Institute of Industrial Sciences. Vol. 58, pp. 95-107. (2009.05)

2008
1.

Cho, B.-M., Kim, J.-G., and Lee, D.-H.

A Two-Stage Heuristic for Period Vehicle Routing: Minimizing the Fleet Size
Journal of Korea Industrial and Systems Engineering, Vol. 31, No. 3, pp. 90-100. (2008.09)(SCI)

2.

Kim, H.-J., Lee, D.-H., and Xirouchakis, P.

An Exact Algorithm for Two-Level Disassembly Scheduling
Journal of the Korean Institute of Industrial Engineers, Vol. 34, No. 4, pp. 414-424.(SCI)

3.

Kim, H.-W., Lee, K.-B., and Lee, D.-H.

Heuristic Algorithms for the Mixed-model Disassembly Line Balancing Problem
Journal of the Korean Society of Supply Chain Management, Vol. 8, No. 2, pp. 9-21.(SCIE)

4.

Kim, J.-S. and Lee, D.-H.

Heuristic Algorithms for Capacitated Collection Network Design in Reverse Logistics
International Journal of Management Science. Vol. 12, No. 2, pp. 45-66. (KCI)

5.

Lee, D.-H., Kim, H.-J., and Kim, J.-S.

Reverse Logistics: Research Issues and Literature Review
Journal of the Korean Institute of Industrial Engineers, Vol. 34, No. 3, pp. 270-288.(SCI)

2007
1.

Choi, H.-S. and Lee, D.-H.

A Branch and Bound Algorithm for Two- Stage Hybrid Flow Shop Scheduling with Minimizing the Number of Tardy Jobs
Journal of the Korean Institute of Industrial Engineers, Vol. 33, pp. 213-220.

2.

Kim, J.-D., Choi, H.-S., and Lee, D.-H.

A Case Study on the Stochastic Vehicle Routing in a Refuse Collection System
Journal of the Korean Society of Supply Chain Management. Vol. 7, No. 2, pp,. 57-65

3.

Kim, J.-G., Lee, D.-H. Choi, S.-H., and Lim, S.-K.

Dynamic Lot-Sizing with Stepwise Transportation Costs
Journal of Korea Industrial and Systems Engineering

4.

Kwon, Y.-J, Kim, J.-G, Seo, J., Lee, D.-H, and Kim, D.-S.

A Voronoi Tabu Search Algorithm for the Cpacitated Vehicle Routing Problem
Journal of the Korean Institute of International Engineers. Vol. 33, No. 4, pp. 468-478

2006
1.

Kim, S,-I., Choi,. H.-S., and Lee, D,-H.

Scheduling Algorithms for Parallel Machine Scheduling with Ready times: Minimizing Total Tardiness
Journal of the Research Institute of Industrial Sciences

2002
1.

Kang, J.-G., Lee, D.-H., Xirouchakis, P., and Lambert, A. J. D.

Optimal Disassembly Sequencing with Sequence Dependent Operation Times based on the Directed Graph of Assembly States
Journal of the Korean Institute of Industrial Engineers, Vol. 28, No. 3, pp. 264-273. (2002.09)

2001
1.

Lee, D.-H., Kiritsis, D., and Xirouchakis, P.

Simulated Annealing Algorithms for Operation Sequencing in Nonlinear Process Planning
Journal of the Korean Institute of Industrial Engineers, Vol. 27, No. 3, pp. 315-327. (2001.09)