PLI Lab Master of Science in Industrial Engineering alumnus
Go, Hun (고훈)
Research Area:


Occupation: Korean Register of Shiooing
2011 M.S. Graduation Thesis:
A mathematical model and solution algorithms for preventive maintenance scheduling of containerships
This thesis considers the problem of determining operation and maintenance schedules for a containership equipped with various components during its sailing according to a pre-determined schedule. The operation schedule, which specifies working times of each component, determines the due0date of each maintenance activity. The main constraints are component requirements, workforce availability, working time limitation, and inter-maintenance time. To represent the problem mathematically, a mixed integer programming model is suggested. Then, due to the complexity of the problem, we suggest a heuristic algorithm for the objective of minimizing the sum of earliness and tardiness between the due-date and the starting time of each maintenance activity. Computational experiments were done on a number of randomly generated test instances and the results are reported. Also, a case study was done on real data and a significant amount of improvement is reported.
Lab Seminars:
1. Refinery units maintenance scheduling using integer programming. 2011.01.04
2. Hybrid evolutionary techniques for the maintenance scheduling problem. 2010.2.15
3. An evolutionary programming-based solution methodology for power generation and transmission maintenance scheduling. 2010.1.31
4. Refinery units maintenance scheduling using integer programming. 2010.1.04
5. Scheduling preventive reilway maintenance activity. (7.13) 2010
6. Maintenance scheduling by simulated annealing method. (8.17) 2010
7. A MIP model for mine equipment scheduling by minimizing maintenance cost. (8.04) 2010