Lee, Jae Ho (이재호)
Research Area:


Occupation: Hyundai MOBIS
2011 M.S. Graduation Thesis:
A tabu search algorithm for unrelated parallel machine scheduling with sequence-and machine-dependent setups:minimizing total tardiness
The problem addressed in this thesis is the scheduling of n independent jobs on m unrelated parallel machines with sequence-dependent setup times for the objective of minimizing total tardiness. Due to the characteristics of unrelated machines, processing time of a job depends on the machine to which the job is assigned. i.e., setup times depend on both sequence and machine. Since one can easily see that the problem is NP-hard, optimal solutions can be found only for small sized instances. Based on this observation, we suggest a tabu search algorithm that incorporates eight neighborhood generation nethods. Computational experiments were done on a number of randomly generated test instances and the results show that the tabu search algorithm suggested in this thesis outperforms the existing search heuristic significantly.
Lab Seminars:
1. Scheduling on unrelated paraellel machines with sequence and machine dependent setup times and due-date constraints. (7.13) 2010
2. Unrelated parallel machine scheduling with setup times using simulated annealing. (8.04) 2010
3. Hybrid metaheuristic for unrelated parallel machine scheduling with sequence-dependent setup times. (8.19) 2010
4. Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective. (1.14) 2009
5. Heuristics for the unrelated parallel machine schedulng problem with setup times. (1.28) 2009
6. A Tabu Search Algorithm to Minimize the Makespan for the Unrelated Parallel Machines Scheduling Problem with Setup Times. (2.11) 2009
7. A bicriteria scheduling with sequence-dependent setup times. (7.08) 2009
8. Scheduling identical parallel machines to minimize total tardiness. (7.29) 2009
9. A mized integer programming model for advanced planning and scheduling. (8.12) 2009
10. Remanufacturing of mobile phones-capacity, program and facility adaptation planning(2.10) 2008