[ WINTER 2014]
[ SUMMER 2014]
4. | A production planning in highly automated manufacturing system considering multiple process plans with different energy requirements. | 07.11 |
5. | TWO MACHINE MIXED SHOP SCHEDULING PROBLEM WITH CONTROLLABLE MACHINE SPEEDS. | 08.13 |
6. | Minimizing total tardiness on a single machine with controllable processing times. | 08.22 |