[ WINTER 2014]

Shin, Jeong Hoon - Ph.D

1. Single-Machine Sustainable Production Planning to Minimize Total Energy Consumption and Total Completion Time Using a Multiple Objective Genetic Algorithm. 01.17
2. A Branch-and-Bound Algorithm for Minimizing the Energy Consumption in the PFS Problem. 02.13
3. Effect of a speed reduction of containerships in response to higher energy costs in Sulphur Emission Control Areas. 02.27

[ SUMMER 2014]
4. A production planning in highly automated manufacturing system considering multiple process plans with different energy requirements. 07.11
5. TWO MACHINE MIXED SHOP SCHEDULING PROBLEM WITH CONTROLLABLE MACHINE SPEEDS. 08.13
6. Minimizing total tardiness on a single machine with controllable processing times. 08.22