[ WINTER 2011]
[ SUMMER 2011]
1. | A heuristic for vehicle fleet mix problem using tabu search and set partitioning. | 7.12 |
2. | A list based threshold accepting metaheuristic for the heterogeneous fixed fleet vehicle routing problem. | 8.23 |
Doh, Hyoung Ho - Ph.D
1. | Efficient, effective lot sizing for multistage production system. | 7.5 |
2. | A Multi-product Dynamic Lot-size Model with Individual and Joint Set-Up Costs. | 8.16 |
Han, Hee Jong - M.S
1. | Methods for optimum and near optimum disassembly sequencing. | 7.26 |
2. | A path-relinking approach for a bi-criteria disassembly sequencing problem. | 7.5 |
3. | Disassembly sequence generation: a petri net based heuristic approach. | 8.16 |
Kim, Dong Hyun - M.S
1. | Heuristics for demand-driven diassembly planning. | 7.19 |
2. | A two-stage heuristic for disassembly scheduling with assembly product structure. | 8.30 |
3. | A genetic algorithm for disassembly scheduling with assembly product structure. | 8.9 |
Kim, Ji Su - Ph.D
1. | Reverse logistics network design for the collection of end-of-life Vehicles in Mexico. | 7.12 |
2. | Designing a distribution network in a supply chain system formulation and efficient solution procedure. | 8.23 |
3. | Reverse logistics network design using simulated annealing. | 8.3 |
Kim, Min Geun - M.S
1. | The shifting bottleneck procedure for job shop scheduling. | 7.26 |
2. | Job shop scheduling with beam search | 7.5 |
Lee, Chul Won - M.S
1. | The Impact of Product Lifecycle on Capacity Planning of Closed-Loop Supply Chains with Remanufacturing | 7.19 |
2. | Robust investment model for long-range capacity expansion of chemical processing networks under uncertain demand forecast scenarios. | 7.20 |
3. | Capacity expansion and allocation for a semiconductor testing facility under constrained budget. | 8.30 |
Lim, Jung Hyo - M.S
1. | Genetic algorithms applied to the continous flow shop problem | 9.14 |
Park, Jung Hyeon - M.S
1. | Using Genetic Algorithms and Heuristics for Job Shop Scheduling with Sequence-Dependent Setup Times. | 7.12 |
2. | Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times. | 8.23 |
3. | Job shop scheduling with separable sequence-dependent setups. | 8.3 |
Yu, Zhoujing - M.S
1. | The Impact of Product Lifecycle on Capacity Planning of Closed-Loop Supply Chains with Remanufacturing. | 7.19 |
Yui, Jae Min - Ph.D
1. | The job shop tardiness problem A decomposition approach. | 8.30 |
2. | A Graph-Theoretic Decomposition of the Job Shop Scheduling Problem to Achieve Scheduling Robustness. | 8.9 |