1. An Integration Model and its Extension for Disassembly Leveling and Lot-sizing for Multiple Product Types. 12.21

Go, Hun - M.S

1. Refinery units maintenance scheduling using integer programming. 01.04

Han, Hee Jong - M.S

1. Mathematical model and solution algorithm for selective disassembly sequencing with multiple target components and sequence-dependent setups. 11.14

Kim, Dong Hyun - M.S

1. Multi-period disassembly leveling and scheduling: Mathematical model and solution algorithm. 11.14
2. A Heuristic for Multi-Period Disassembly Leveling and Scheduling. 12.21

Kim, Hyung Won - Ph.D

1. Scheduling jobs under constant period-by-period resource availability to maxmize project profit at a due date. 01.04

Kim, Ji Su - Ph.D

1. A column generation heuristic for a dynamic generalized assignment problem. 01.04

[ SUMMER 2011]

Choi, Young Jae - M.S

1. A heuristic for vehicle fleet mix problem using tabu search and set partitioning. 7.12
2. A list based threshold accepting metaheuristic for the heterogeneous fixed fleet vehicle routing problem. 8.23

Doh, Hyoung Ho - Ph.D

1. Efficient, effective lot sizing for multistage production system. 7.5
2. A Multi-product Dynamic Lot-size Model with Individual and Joint Set-Up Costs. 8.16

Han, Hee Jong - M.S

1. Methods for optimum and near optimum disassembly sequencing.7.26
2. A path-relinking approach for a bi-criteria disassembly sequencing problem. 7.5
3. Disassembly sequence generation: a petri net based heuristic approach.8.16

Kim, Dong Hyun - M.S

1. Heuristics for demand-driven diassembly planning.7.19
2. A two-stage heuristic for disassembly scheduling with assembly product structure. 8.30
3. A genetic algorithm for disassembly scheduling with assembly product structure.8.9

Kim, Ji Su - Ph.D

1. Reverse logistics network design for the collection of end-of-life Vehicles in Mexico. 7.12
2. Designing a distribution network in a supply chain system formulation and efficient solution procedure. 8.23
3. Reverse logistics network design using simulated annealing. 8.3

Kim, Min Geun - M.S

1. The shifting bottleneck procedure for job shop scheduling.7.26
2. Job shop scheduling with beam search7.5

Lee, Chul Won - M.S

1. The Impact of Product Lifecycle on Capacity Planning of Closed-Loop Supply Chains with Remanufacturing7.19
2. Robust investment model for long-range capacity expansion of chemical processing networks under uncertain demand forecast scenarios. 7.20
3. Capacity expansion and allocation for a semiconductor testing facility under constrained budget.8.30

Lim, Jung Hyo - M.S

1. Genetic algorithms applied to the continous flow shop problem9.14

Park, Jung Hyeon - M.S

1. Using Genetic Algorithms and Heuristics for Job Shop Scheduling with Sequence-Dependent Setup Times. 7.12
2. Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times.8.23
3. Job shop scheduling with separable sequence-dependent setups.8.3

Yu, Zhoujing - M.S

1. The Impact of Product Lifecycle on Capacity Planning of Closed-Loop Supply Chains with Remanufacturing. 7.19

Yui, Jae Min - Ph.D

1. The job shop tardiness problem A decomposition approach.8.30