[ WINTER 2009]

Choi, Young Jae - [M.S]

1. nformation sharing in supply chains. (2.25)

Doh, Hyoung Ho - [M.S]

1. Capacitated dynamic lot sizing problems in closed-loop supply chain. (2.04)
2. Deterministic Production Planning with Concave Cost and Capacity Constraints. (1.21)
3. On the optimal design of the disassembly and recovert process (1.07)
4. The market-orienred dynamic product recovery model in the just-in-time framework (3.04)

Han, Hee Jong - [M.S]

1. Disassembly sequence planning in a disassembly cell context. (2.18)

Jeong, Taek Seop - [M.S]

1. A mathematical model for optimal and phased implementation of flexible manufacturing systems. (1.28)
2. Capacity Optimization of Flexible Manufacturing Systems under Budget Constraints. (1.14)
3. Integrating Reconfiguration Cost Into the Design of Multi-Period Scalable Reconfigurable Manufacturing Systems. (2.11)

Kang, Kyung Wan - [M.S]

1. A Multi-objective Methodology for Evaluating Product End-of Life options and Disassembly. (1.21)
2. Incorporating Component Reuse, Remanufacture, and Recycle Into Product Portfolio Design. (2.25)
3. Model for the allocation of electronics components to reuse options. (2.11)

Kim, Dong Hyun - [M.S]

1. Design for product retirement and material life-cycle (2.04)

Kim, Hyung Won - [Ph.D]

1. R&D project selection and scheduling with a filterd beam search approach. (2.08)
2. Multiple resource constrained scheduling using branch-and-bound. (3.04)
3. The multiple resource constrained project scheduling problem : A breadth-first approach. (1.14)

Kim, Ji Su - [Ph.D]

1. Minimum Covering Criterion for Obnoxious Facility Location on a Network. (1.07)
2. The equitable dispersion problem. (3.04)
3. The single allocation problem in the interacting three-hub network. (1.28)

Ko, Hun - [M.S]

1. Preventive maintenance scheduling of multi-cogeneration plants using integer programming. (2.18)
2. Scheduling of railway track maintenance activities and crews. (1.21)
3. Scheduling preventive maintenance for modular designed components : A dynamic approach. (2.04)

Lee, Jae Ho - [M.S]

1. A Tabu Search Algorithm to Minimize the Makespan for the Unrelated Parallel Machines Scheduling Problem with Setup Times. (2.11)
2. Heuristics for the unrelated parallel machine schedulng problem with setup times. (1.28)
3. Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective. (1.14)

Yu, Jae Min - [M.S]

1. A note on single-machine scheduling with decreasing time-dependent job processing times. (2.08)
2. An Algorithm for Solving the Job-Shop Problem. (1.07)
3. Computing lower and upper bounds for a large-scale industrial job shop scheduling problem. (1.28)

[ SUMMER 2009]

Ahn, Hyung Dae - [M.S]

1. Comparative studies on dynamic programming and integer programming approaches for concave cost production/inventory control problems. (7.15)
2. Performance analysis of a hybrid system under quality impact of returns. (8.05)
3. Joint procurement and production decisions in remanufacturing under quality and demand uncertainty. (8.17)

Doh, Hyoung Ho - [M.S]

1. An optimal inventory model for the intermediate echelon when repair is possible. (7.22)
2. Capacipated dynamic lot sizing problems in closed-loop supply chain. (8.13)

Ha, Kyoung Woon - [M.S]

1. A path relinking approach for the team orienteering problem. (7.08)
2. The one-period bus touring problem: Solved by an effective heuristic for the orienteering tour problem and improvement algorithm. (8.24)
3. The orienteering problem with time windows. (7.29)

Jeong, Taek Seop - [M.S]

1. Multi-objective modeling for determining location of undeseirable facilities. (7.22)
2. A reverse logistics cost minimization model for the treatment of hazardous wastes. (8.12)

Kang, Kyung Wan - [M.S]

1. A tabu search approach to the uncapacitated facility loaction problem. (8.05)
2. A decision support system for a real vehicle routing problem. (8.17)
3. A simulated annealing methodology to distribution network design and management. (7.22)

Kim, Hyung Won - [Ph.D]

1. Project selection, scheduling and resource allocation with time dependent returns. (7.15)
2. . Analysis of scheduling schemes and heuristic rules performance in resource-constrained multi-project scheduling. (8.05)
3. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. (8.25)

Kim, Ji Su - [Ph.D]

1. The capacity and distance constrained plant location problem. (7.08)
2. The capacity plant location problem with multiple facilities in the same site. (8.24)
3. The directional p-median: definition, complexity and algorithms. (7.29)

Ko, Hun - [M.S]

1. Marine inventory routing: shipments planning. (8.31)

Lee, Jae Ho - [M.S]

1. A bicriteria scheduling with sequence-dependent setup times. (7.08)
2. A mized integer programming model for advanced planning and scheduling. (8.12)
3. Scheduling identical parallel machines to minimize total tardiness. (7.29)

Shim, Ik Soo - [M.S]

1. GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem.(7.29)
2. Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. (8.17)
3. The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. (7.08)