[ WINTER 2008]
1. | Heuristics for demand driven disassembly planning(1.6) | |
2. | Lot sizing in reverse MRP for scheduling disassembly | |
3. | Lot-sizing for inventory systems with product recovery(1.21) |
Ha, Kyoung Woon - M.S
1. | A heuristic for the multiple tour maximum collection problem(1.6) | |
2. | Harmony search for generalized orienteering problem: Best touring in China(2.10) | |
3. | Variable neighborhood search for the orienteering problem(1.21) |
Jeong, Taek Seop - M.S
1. | Manufacturing network configuration in supply chains with product recovery(2.17) |
Kang, Kyung Wan - M.S
1. | An analytical model for reverse automotive production planning and pricing(2.26) |
Kim, Hyung Won - M.S
1. | A multiple shift workforce scheduling model under annualized hours(2.26) | |
2. | Multiple shift workforce scheduling under the 3-4 workweek with different weekday and weekend labor requirements(1.13) | |
3. | Work force size and single shift schedules with variable demands(2.3) |
Kim, Ji Su - Ph.D
1. | A facility location model for bidirectional flows(2.10) | |
2. | Designing a distribution network in a supply chain system: Formulation and efficient solution procedure(1.28) | |
3. | Exact and heuristic algorithm for the uncapacitated multiple allocation p-hub median problem(1.6) |
Lee, Jae Ho - M.S
1. | Remanufacturing of mobile phones-capacity, program and facility adaptation planning(2.10) |
Ma, Yoen Seok - M.S
1. | An algorithm for optimizing the servicing of products with constrained, multiple defects(2.17) | |
2. | Design and implementation of an adaptive process planner for disassembly processes(1.28) | |
3. | On a medium term product recovery and disposal strategy for durable assembly products(1.13) (2.15) |
Shim, Ik Soo - M.S
1. | An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty(1.13) | |
2. | Capacitated lot sizing with sequence dependent setup costs(2.17) | |
3. | The impact of product recovery on logistics network design(2.3) |
[ SUMMER 2008]
1. | Heuristics genetic algorithm for capacitated production planning problems with batch processing and remanufacturing (07.23) | |
2. | Production planning for remanufactured products (08.13) | |
3. | Supply planning model for remanufacturing system in reverse logistics environment (08.26) |
Choi, Hyun Seon - Ph.D
1. | Heuristics for dynamic jop shop scheduling with real-time updated queueing time estimates (8.20) |
Doh, Hyoung Ho - M.S
1. | MIP-based heuristics for capacitated lotsizing problems (08.26) | |
2. | On alternative mixed integer programming formulations and LP-based heuristics for lot-sizing with setup times (07.30) | |
3. | Solving mixed integer programming production planning problems with setups by shadow price information (07.09) |
Ha, Kyoung Woon - M.S
1. | Air weapon missile-target allocation models for naval task group (07.09) | |
2. | A weapon-target assignment approach to media allocation (07.30) | |
3. | The U.S Army National Guard's mobile training simulator location and routing problem (8.20) |
Kim, Hyung Won - M.S
1. | Branch and bound algorithms for simple assembly line balancing problem (07.23) | |
2. | Branch and bound algorithms for the multi-product assembly line balancing problem (08.06) |
Kim, Ji-Su - Ph.D
1. | An exact algorithm for the capacitated facility location problems with single sourcing (8.20) | |
2. | Developing new formulations and relaxations of single stage capacitated warehouse location problem (07.30) | |
3. | The fixed charge facility location problem with coverage restrictions (07.09) |
Kim, Jun Gyu - Ph.D
1. | optimal common due-date with completion time tolerance (07.16) |
Ma, Yoen Seok - M.S
1. | Integrated approach for disassembly processes generation and recycling evaluation of an end-of-life product (8.20) | |
2. | A path-relinking approach for a bi-criteria disassembly sequencing problem (08.06) | |
3. | Heuristics for demand disassembly planning (07.23) |
Shim, Ik Soo - M.S
1. | A fuzzy quality function deployment system for buildable design decision-making (08.26) | |
2. | Development of integrated design for disassembly and recycling in concurrent engineering(08.06) | |
3. | Optimizing disassembly process subject to sequence-dependent cost (07.16) |
Yu, Jae Min - M.S
1. | A fast taboo search algorithm for the jop shop problem (08.13) | |
2. | Lagrangian bounds for just-in-time job-shop scheduling (07.23) | |
3. | Minimizing production flow time in a process and assembly job shop (08.26) |