[ WINTER 2008]

Ahn, Hyung Dae - M.S

1. Heuristics for demand driven disassembly planning(1.6)
2. Lot sizing in reverse MRP for scheduling disassembly
3. Lot-sizing for inventory systems with product recovery(1.21)

Ha, Kyoung Woon - M.S

1. A heuristic for the multiple tour maximum collection problem(1.6)
2. Harmony search for generalized orienteering problem: Best touring in China(2.10)
3. Variable neighborhood search for the orienteering problem(1.21)

Jeong, Taek Seop - M.S

1. Manufacturing network configuration in supply chains with product recovery(2.17)

Kang, Kyung Wan - M.S

1. An analytical model for reverse automotive production planning and pricing(2.26)

Kim, Hyung Won - M.S

1. A multiple shift workforce scheduling model under annualized hours(2.26)
2. Multiple shift workforce scheduling under the 3-4 workweek with different weekday and weekend labor requirements(1.13)
3. Work force size and single shift schedules with variable demands(2.3)

Kim, Ji Su - Ph.D

1. A facility location model for bidirectional flows(2.10)
2. Designing a distribution network in a supply chain system: Formulation and efficient solution procedure(1.28)
3. Exact and heuristic algorithm for the uncapacitated multiple allocation p-hub median problem(1.6)

Lee, Jae Ho - M.S

1. Remanufacturing of mobile phones-capacity, program and facility adaptation planning(2.10)

Ma, Yoen Seok - M.S

1. An algorithm for optimizing the servicing of products with constrained, multiple defects(2.17)
2. Design and implementation of an adaptive process planner for disassembly processes(1.28)
3. On a medium term product recovery and disposal strategy for durable assembly products(1.13) (2.15)

Shim, Ik Soo - M.S

1. An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty(1.13)
2. Capacitated lot sizing with sequence dependent setup costs(2.17)
3. The impact of product recovery on logistics network design(2.3)

[ SUMMER 2008]

Ahn, Hyung Dae - M.S

1. Heuristics genetic algorithm for capacitated production planning problems with batch processing and remanufacturing (07.23)
2. Production planning for remanufactured products (08.13)
3. Supply planning model for remanufacturing system in reverse logistics environment (08.26)

Choi, Hyun Seon - Ph.D

1. Heuristics for dynamic jop shop scheduling with real-time updated queueing time estimates (8.20)

Doh, Hyoung Ho - M.S

1. MIP-based heuristics for capacitated lotsizing problems (08.26)
2. On alternative mixed integer programming formulations and LP-based heuristics for lot-sizing with setup times (07.30)
3. Solving mixed integer programming production planning problems with setups by shadow price information (07.09)

Ha, Kyoung Woon - M.S

1. Air weapon missile-target allocation models for naval task group (07.09)
2. A weapon-target assignment approach to media allocation (07.30)
3. The U.S Army National Guard's mobile training simulator location and routing problem (8.20)

Kim, Hyung Won - M.S

1. Branch and bound algorithms for simple assembly line balancing problem (07.23)
2. Branch and bound algorithms for the multi-product assembly line balancing problem (08.06)

Kim, Ji-Su - Ph.D

1. An exact algorithm for the capacitated facility location problems with single sourcing (8.20)
2. Developing new formulations and relaxations of single stage capacitated warehouse location problem (07.30)
3. The fixed charge facility location problem with coverage restrictions (07.09)

Kim, Jun Gyu - Ph.D

1. optimal common due-date with completion time tolerance (07.16)

Ma, Yoen Seok - M.S

1. Integrated approach for disassembly processes generation and recycling evaluation of an end-of-life product (8.20)
2. A path-relinking approach for a bi-criteria disassembly sequencing problem (08.06)
3. Heuristics for demand disassembly planning (07.23)

Shim, Ik Soo - M.S

1. A fuzzy quality function deployment system for buildable design decision-making (08.26)
2. Development of integrated design for disassembly and recycling in concurrent engineering(08.06)
3. Optimizing disassembly process subject to sequence-dependent cost (07.16)

Yu, Jae Min - M.S

1. A fast taboo search algorithm for the jop shop problem (08.13)
2. Lagrangian bounds for just-in-time job-shop scheduling (07.23)
3. Minimizing production flow time in a process and assembly job shop (08.26)