[ WINTER 2007]
1. | Lot sizing problem on a paper machine under a cyclic production approach | |
2. | Minimizing total tardiness of orders with reentrant lots in a hybrid (1.4) | |
3. | Optimal assignment of due-dates for a single processor scheduling problem (2.15) |
Kim, Hyeok Chol - M.S
1. | Capacitated lot-sizing with sequence dependent setup costs (2.22) | |
2. | Discrete Lotsizing and Scheduling by Batch Sequencing (2.15 ) |
Kim, Hyung Won - M.S
1. | Minimizing makespan on an m-machine re-entrant flowshop (2.1) | |
2. | A heuristic for scheduling a permutation flowshop with makespan objective subjective to maximum tardiness (1.11) | |
3. | Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines (2.22) |
Kim, Ji Su - Ph.D
1. | Hybrid scatter search and path relinking for the capacitated p-median problem (2.7) | |
2. | Modeling Facility Location Problems as Generalized assignment problems (1.16) | |
3. | On the Conditional p-median problem (2.22) |
Kim, Jun Kyu - Ph.D
1. | Due date assignment and maintenance activity scheduling problem (2.1) | |
2. | Scheduling with Multiple Performance Measures : The One-Machine Case (2.15) | |
3. | Two due date assignment problems in scheduling a single machine |
Lee, Kwang Bok - M.S
1. | A branch and bound based solution approach for the mixed model assembly line balancing problem for minimizing stations and task duplication costs (1.4) | |
2. | A heuristic for solving mixed model line balancing problems with stochastic task durations and parallel stations (2.15) | |
3. | Handling the assembly line balancing problem in the clothing industry using a genetic algorithm (1.25) |
[ SUMMER 2007]
1. | Common due window size and location determination in a single machine scheduling problem (7.2) | |
2. | Scheduling with product family set-up times: an application in TFT LCD manufacturing (8.7) |
Doh, Hyoung Ho - M.S
1. | Optimal control of a one product recovery system with leadtimes (7.2) | |
2. | Production planning for closed-loop supply chains with product recovery and reuse: an analystical approach (7.18) | |
3. | Remanufacturing planning fir the reverse Wagner / Whitin models (8.14) |
Kim, Hyeok Cho - M.S
1. | Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups (7.24) | |
2. | Lot sizing and scheduling with sequence dependent setup costs and times and efficient rescheduling opportunities (8.21) | |
3. | Sequential-analysis Based Randomized-regret-methods for Lot-sizing and Scheduling (8.13) | |
4. | The capacitated lot-sizing and shceduling problem with sequence-dependent setup costs and times (7.31) |
Kim, Jun Kyu - Ph.D
1. | Optimal Due-Date Determination and sequencing of n jobs on a Single Machine (7.24) | |
2. | Selection of Dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system (7.10) |
Lee, Kwang Bok - M.S
1. | A hybrid genetic algorithm for the re-entrant flow-shop scheduling problem (6.29) | |
2. | Algorithms for flexible flow shop problems with unrelated parallel machine, setup times, and dual criteria (8.7) | |
3. | Minimizing makespan in re-entrant permutation flow-shops (7.18) | |
4. | Schedulinh multi-stage parallel-processor services to minimize average response time (8.21) |
Yu, Jae Min - M.S
1. | Simple priority rule combinations: an approach to improve both flow time and tardiness (8.21) | |
2. | Performace of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly (8.7) | |
3. | Stochastic Scheduling with Release Dates and Due Dates (7.24) |