|
2024 1. | Cho, Y., Kim, H.-I., Kim, Y.-R., Yu, S.-G., Kim, B.-H., and Lee, D.-H. A scheduling mechanism for hybrid flow shops with reworks under general queue time limits Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture 238(6-7): 962-970. SCIE (2024.05) | |
2. | Doh, H.-H. and Lee, D.-H. Dynamic lot-sizing for remanufacturing systems with multi-level structured products and components commonality Applied Mathematical Modelling 125, 789-808 SCIE (2024.01) | |
3. | Jung, H.-B., Kim, H.-I. and Lee, D.-H. Team orienteering with possible multiple visits: Mathematical model and solution algorithms Computers and Industrial Engineering, 190: 110074, SCIE (2024.04) | |
4. | Kim, H.-I., Youn, A.-J. and Lee, D.-H. A mathematical model and solution algorithms for optimizing system-level configurations of reconfigurable single part flow lines International Journal of Production Research, SCIE | |
5. | Sim, D.-G. and Lee, D.-H. A two-stage solution approach for scheduling flexible manufacturing systems with multi-fixturing pallets Flexible Services and Manufacturing Journal, SCIE | |
2023 1. | Choi, Y.-H., Kim, H.-I. and Lee, D.-H. Disassembly leveling and lot-sizing for multiple product types with uncertain component demands Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture 237(11): 1660-1670, SCIE (2023.11) | |
2. | Kim, H.-I. and Lee, D.-H. Scheduling algorithms for multi-stage flow shops with reworks under overlapped queue time limits International Journal of Production Research 61(20): 6809-6822, SCIE (2023.11) | |
2022 1. | Doh, H.-H. and Lee, D.-H. Integrated disassembly and reprocessing lotsizing for multi-level structured products in remanufacturing systems Engineering Optimization 54(9): 1476-1493, SCIE (2022.09) | |
2021 1. | Zeid, I. B., Doh, H.-H., Shin, J.-H., and Lee, D.-H. Fast and meta heuristics for part selection in flexible manufacturing systems with controllable processing times Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 235(4): 650-662. SCI (2021.03) | |
2020 1. | Lee, D.-K., Shin, J.-H., and Lee, D.-H. Operations scheduling for an advanced flexible manufacturing system with multi-fixturing pallets Computers & Industrial Engineering, 144: 106496 SCIE (2020.04) | |
2. | Shin, J.-H., Yu, J.-M., Doh, H.-H., Kim, H.-W., and Lee, D.-H. Batching and Scheduling for a Single-machine Flexible Machining Cell with Multi-Fixturing Pallets and Controllable Processing Times International Journal of Production Research, Vol. 58, No. 3, pp. 863-877. SCI (2020.02) | |
2019 1. | Kim, H.-W., Joo, G.-H., and Lee, D.-H. Multi-period Heterogeneous Vehicle Routing considering Carbon Emission Trading International Journal of Sustainable Transportation, Vol. 13, No. 5, pp. 340-349. SSCI (2019.05) | |
2. | Kim, J.-S., and Lee, D.-H. Collection Network Design with Capacity Planning in Reverse Logistics: Static and Restricted Dynamic Models Engineering Optimization, Vol. 51, No. 8, pp. 1430-1445. SCIE (2019.08) | |
3. | Zhou, Y.-D., Shin. J.-H., and Lee, D.-H. Loading and Scheduling for Flexible Manufacturing Systems with Controllable Processing Times Engineering Optimization, Vol. 51, No. 3, pp. 412-426. SCIE (2019.03) | |
2018 1. | Cho, Y.-H., Doh, H.-H., and Lee, D.-H. Mathematical Model and Solution Algorithms for Capacitated Dynamic Lot-sizing in Remanufacturing Systems Industrial Engineering & Management Systems, Vol. 17, No. 1, pp. 1-13. SCOPUS (2018.03) | |
2. | Kim, D.-H., Doh, H.-H., and Lee, D.-H. Multi-period Disassembly Levelling and Lot-sizing for Multiple Product Types with Parts Commonality Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 232, No. 5, pp. 867-878. SCI (2018.04) | |
3. | Kim, H.-W., and Lee, D.-H. A Sample Average Approximation Algorithm for Selective Disassembly Sequencing with Abnormal Disassembly Operations and Random Operation Times The International Journal of Advanced Manufacturing Technology, Vol. 96, No. 1-4, pp. 1341-1354. SCIE (2018.04) | |
4. | Kim, H.-W., Park, C., and Lee, D.-H. Selective Disassembly Sequencing with Random Operation Times in Parallel Disassembly Environment International Journal of Production Research, Vol. 56, No. 24, pp. 7243-7257. SCI (2018.12) | |
5. | Ulugov, A., Shin, J.-H., and Lee, D.-H. Common Due-date Assignment and Scheduling on a Single Machine with Sequence-dependent Setups and Discretely Controllable Job Processing Times International Journal of Industrial Engineering: Theory, Applications and Practice, Vol. 25, No. 5, pp. 580-589. SCIE (2018.10) | |
6. | Yu, J.-M., and Lee, D.-H. Solution Algorithms to Minimize the Total Family Tardiness for Job Shop Scheduling with Job Families European Journal of Industrial Engineering, Vol. 12, No. 1, pp. 1-23. SCIE (2018.01) | |
7. | Yu, J.-M., and Lee, D.-H. Scheduling Algorithms for Job-shop-type Remanufacturing Systems with Component Matching Requirement Computers & Industrial Engineering, Vol. 120, pp. 266-278. SCIE (2018.06) | |
2017 1. | Kim, H.-W., and Lee, D.-H. An Optimal Algorithm for Selective Disassembly Sequencing with Sequence-dependent Setups in Parallel Disassembly Environment International Journal of Production Research, Vol. 55, No. 24, pp. 7317-7333. SCI (2017.12) | |
2. | Kim, J.-M., Zhou, Y.-D., and Lee, D.-H. Priority Scheduling to Minimize the Total Tardiness for Remanufacturing Systems with Flow-shop-type Reprocessing Lines The International Journal of Advanced Manufacturing Technology, Vol. 91, No. 9-12, pp. 3697-3708. SCIE (2017.08) | |
3. | Kim, J.-S., Park, J.-H., and Lee, D.-H. Iterated Greedy Algorithms to Minimize Total Family Flow Time for Job Shop Scheduling with Job Families and Sequence-dependent Setups Engineering Optimization, Vol. 49, No. 10, pp. 1719-1732. SCIE (2017.10) | |
4. | Yu, J.-M., Huang, R., and Lee, D.-H. Iterative Algorithms for Batching and Scheduling to Minimize the Total Job Tardiness in Two-stage Hybrid Flow Shops International Journal of Production Research, Vol. 55, No. 11, pp. 3266-3282. SCI (2017.06) | |
2016 1. | Doh, H.-H., Yu, J.-M., Kwon, Y.-J., Suh, M.-S., and Lee, D.-H. Priority Scheduling for a Flexible Job Shop with a Reconfigurable Manufacturing Cell Industrial Engineering & Management Systems, Vol. 15, No. 1, pp. 11-18. SCOPUS (2016.03) | |
2. | Kang, K.-W., Doh, H.-H., Park, J.-H., and Lee, D.-H. Disassembly Leveling and Lot-sizing for Multiple Product Types: a Basic Model and its Extension The International Journal of Advanced Manufacturing Technology, Vol. 82, No. 9-12, pp. 1463-1473. SCIE (2016.02) | |
2015 1. | Kim, J.-S., and Lee, D.-H. An Integrated Approach for Collection Network Design, Capacity Planning and Vehicle Routing in Reverse Logistics Journal of the Operational Research Society, Vol. 66, No. 1, pp. 76-85. SCI (2015.01) |
2. | Kim, J.-S., and Lee, D.-H. A Case Study on Collection Network Design, Capacity Planning and Vehicle Routing in Reverse Logistics International Journal of Sustainable Engineering, Vol. 8, No. 1, pp. 66-76. SCOPUS (2015.02) |
3. | Kim, M.-G., Yu, J.-M., and Lee, D.-H. Scheduling Algorithms for Remanufacturing Systems with Flow-Shop-Type Reprocessing Lines International Journal of Production Research, Vol. 53, No. 6, pp. 1819-1831. SCI (2015.03) |
4. | Lee, C.-W., Doh, H.-H., and Lee, D.-H. Capacity and Production Planning for a Hybrid System with Manufacturing and Remanufacturing Facilities Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 229, No. 9, pp. 1645-1653. SCI (2015.09) |
2014 1. | Yu, Z.-J., Shin, J.-H., and Lee, D.-H. An Operation-level Dynamic Capacity Scalability Model for Reconfigurable Manufacturing Systems International Journal of Industrial Engineering: Theory, Applications and Practice, Vol. 21, No. 6, pp. 317-326. SCIE (2014.12) |
2013 1. | Doh, H.-H., Yu, J.-M., Kim, J.-S., Lee, D.-H., and Nam, S.-H. A Priority Scheduling Approach for Flexible Job Shops with Multiple Process Plans International Journal of Production Research. Vol. 51, No. 12, pp. 3748-3764. SCI (2013.06) |
2. | Go, H., Kim, J.-S., and Lee, D.-H. Operation and Preventive Maintenance Scheduling of Containerships: Mathematical Model and Solution Algorithm European Journal of Operational Research, Vol. 229, No. 3, pp. 626-636. SCIE (2013.09) |
3. | Han, H.-J., Yu, J.-M., and Lee, D.-H. Mathematical Model and Solution Algorithms for Selective Disassembly Sequencing with Multiple Target Components and Sequence-Dependent Setups International Journal of Production Research, Vol. 51, No. 16, pp. 4997-5010. SCI (2013.08) |
4. | Kim, J.-G., Yu, J.-M., and Lee, D.-H. Common Due-date Assignment and Scheduling on Parallel Machines with Sequence-dependent Setup Times Management Science and Financial Engineering, Vol. 19, No. 1, pp. 29-36. KCI (2013.05) |
5. | Kim, J.-S. and Lee, D.-H. Designing Refuse Collection Networks under Capacity and Maximum Allowable Distance Constraints Management Science and Financial Engineering, Vol. 19, No. 2, pp. 19-29. KCI (2013.11) |
6. | Kim, J.-S., and Lee, D.-H. A Restricted Dynamic Model for Designing Refuse Collection Networks in Reverse Logistics Computers & Industrial Engineering, Vol. 66, No. 4, pp. 1131-1137. SCIE (2013.12) |
7. | Kwon, Y.-J., Choi, Y.-J., and Lee, D.-H. Heterogeneous Fixed Fleet Vehicle Routing Considering Carbon Emission Transportation Research Part D: Transport and Environment, Vol. 23, pp. 81-89. SSCI/SCIE (2013.08) |
8. | Lee, J.-H., Yu, J.-M., and Lee, D.-H. A Tabu Search Algorithm for Unrelated Parallel Machine Scheduling with Sequence and Machine Dependent Setups: Minimizing Total Tardiness The International Journal of Advanced Manufacturing Technology. Vol. 69, No. 9-12, pp. 2081-2089.SCIE (2013.12) |
9. | Yu, J.-M., Doh, H.-H., Kim, J.-S., Kwon, Y.-J., Lee, D.-H., and Nam, S.-H Input Sequencing and Scheduling for a Reconfigurable Manufacturing System with a Limited Number of Fixtures The International Journal of Advanced Manufacturing Technology, Vol. 67, No. 1, pp. 157-169. SCIE (2013.07) |
2012 1. | Jun, H.-B., Lee, D.-H., Kim, J.-G., and Kiritsis, D. Heuristic Algorithms for Minimizing Total Recovery Cost of End-of-Life Products under Quality Constraint International Journal of Production Research. (SCI) |
2. | Kim, H.-W., Yu, J.-M., Kim, J.-S., Doh, H.-H., Lee, D.-H., and Nam, S.-H. Loading Algorithms for Flexible Manufacturing Systems with Partially Grouped Unrelated Machines and Additional Tooling Constraints International Journal of Advanced Manufacturing Technology, Vol. 58, No. 5-8, pp. 683-691. (SCIE) |
3. | Kim, J.-G., Kim, J.-S., and Lee, D.-H. Common Due-date Assignment and Sequencing with Sequence-dependent Setup Times: a Case Study on a Paper Remanufacturing System Management Science and Financial Engineering, Vol. 18, No. 1, pp. 1-12. (KCI) |
4. | Kim, J.-G., Kim, J.-S., and Lee, D.-H. Fast and Meta-Heuristics for Common Due-Date Assignment and Scheduling on Parallel Machines International Journal of Production Research. (SCI) |
5. | Yu, J.-M., Doh, H.-H., Kim, H.-W., Kim, J.-S., , Lee, D.-H., and Nam, S.-H. Iterative Algorithms for Part Grouping and Loading in Cellular Reconfigurable Manufacturing Systems Journal of the Operational Research Society. (SCI) |
2011 1. | Ahn, H. D., Lee, D.-H., and Kim, H.-J. Solution Algorithms for Dynamic Lot-sizing in Remanufacturing Systems International Journal of Production Research, Vol. 49, No. 22, pp. 6729-6748. (SCI) |
2. | Choi, H.-S., Kim, J.-S., and Lee, D.-H. Real-Time Scheduling for Reentrant Hybrid Flow Shops: a Decision Tree based Mechanism and its Application to a TFT-LCD line Expert Systems with Applications, Vol. 38, No. 4, pp. 3514-3521. (SCIE) |
3. | Ha, K.-W., Yu, J.-M., Park, J.-I., and Lee, D.-H. Priority Rule based Heuristics for the Team Orienteering Problem International Journal of Management Science, Vol. 17, No. 1, pp. 79-94. (KCI) |
4. | Kim, J.-G., Kim, J.-S., and Lee, D.-H. A Case Study on Period Vehicle Routing in a Refuse Collection System International Journal of Sustainable Engineering, Vol. 4, No. 3, pp. 215-223. (SCOPUS) |
5. | Ma, Y.-S., Jun, H.-B., Kim, H.-W., and Lee, D.-H. Disassembly Process Planning Algorithms for End-of-Life Product Recovery and Environmentally Conscious Disposal International Journal of Production Research, Vol. 49, No. 23, pp. 7007-7027. (SCI) |
6. | Shim, I.-S., Kim, H.-C., Doh, H.-H., and Lee, D.-H. A Two-Stage Heuristic for Single Machine Capacitated Lot-Sizing and Scheduling with Sequence-dependent Setup Costs Computers and Industrial Engineering, Vol. 61, No. 4, pp. 920-929. (SCIE) |
7. | Yu, J.-M., Kim, J.-S., and Lee, D.-H. Scheduling Algorithms to Minimize the Total Family Flow Time for Job Shops with Job Families International Journal of Production Research, Vol. 49, No. 22, pp. 6885-6903. (SCI) |
2010 1. | Doh, H.-H. and Lee, D.-H. Generic Production Planning Model for Remanufacturing Systems Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 224, pp. 159-168. (SCI) |
2009 1. | Choi, H.-S. and Lee, D.-H. Scheduling Algorithms to Minimize the Number of Tardy Jobs in Two- Stage Hybrid Flow Shops Computers and Industrial Engineering, Vol. 56, No. 1, pp. 113-120. (SCIE) |
2. | Choi, H.-S., Kim, H.-W., Lee, D.-H., Yun, J., Yoon, C. Y., and Chae, K. B. Scheduling Algorithms for Two-Stage Reentrant Hybrid Flow Shops: Minimizing Makespan under the Maximum Allowable Due-dates International Journal of Advanced Manufacturing Technology, Vol. 42, pp. 963-973. (SCIE) |
3. | Kim, H.-J., Lee, D.-H., Xirouchakis, P., and Kwon, O.-K. A Branch and Bound Algorithm for Disassembly Scheduling with Assembly Product Structure Journal of the Operational Research Society, Vol. 60, pp. 419-430. (SCI) |
4. | Kim, H.-W. and Lee, D.-H. Heuristics for Reentrant Hybrid Flow Shops with Unrelated Parallel Machines Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 223, pp. 433-442. (SCI) |
5. | Kim, J.-G. and Lee, D.-H Algorithms for Common Due-Date Assignment and Sequencing in a Single Machine with Sequence-Dependent Setup Times Journal of the Operational Research Society, Vol. 60, pp. 1264-1272. (SCI) |
2008 1. | Park, S.-H. and Lee, D.-H. Sequencing Algorithms for Multiple Arc-Welding Robots Considering Thermal Distortion International Journal of Production Research, Vol. 46, No. 17, pp. 4751-4767. (SCI) |
2007 1. | Kim, H.-J., Lee, D.-H., and Xirouchakis, P. Disassembly Scheduling: Literature Review and Further Research Directions International Journal of Production Research. Vol. 45, No. 18&19, pp. 4465 - 4484. (SCI) |
2. | Kim, S.-I. , Choi, H.-S., and Lee, D.-H. Scheduling Algorithms for Parallel Machines with Sequence-dependent Setup and Distinct Ready times: Minimizing Total Tardiness Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 221, No. 6, pp. 1087-1096. (SCI) |
2006 1. | Choi, S.-H., Park, M.-W., Lee, D.-H., Jeong, K.-C., Lim, S.-K., Kim, J.-G., and Lee, G.-C. A Conceptual Framework of an Advanced Planning and Scheduling System for Printed Circuit Board Manufacturing Lines Asia Pacific Management Review, Vol. 11, pp. 133-140. |
2. | Jeon, H.-B., Kim, J.-G., Kim, H.-J., and Lee, D.-H. A Two-Stage Heuristic for Disassembly Scheduling with Capacity Constraints International Journal of Management Science, Vol. 12, pp. 95-112 |
3. | Kim, H.-J., Lee, D.-H., and Xirouchakis, P. A Two-Phase Heuristic for Disassembly Scheduling with Multiple Product Types and Parts Commonality International Journal of Production Research, Vol. 44, pp. 195-212. (SCI) |
4. | Kim, H.-J., Lee, D.-H., and Xirouchakis, P. A Lagrangean Heuristic Algorithm for Disassembly Scheduling with Capacity Constraints Journal of the Operational Research Society, Vol. 57, pp. 1231-1240. (SCI) |
5. | Kim, J.-G., Jeon, H.-B., Kim, H.-J., Lee, D.-H., and Xirouchakis, P. Disassembly Scheduling with Capacity Constraints: Minimizing the Number of Products Disassembled Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 220, pp. 1473-1481. (SCI) |
6. | Kim, S.-I. , Choi, H.-S. , and Lee, D.-H. Tabu Search Algorithms for Parallel Machine Scheduling with Sequence-Dependent Setup and Ready Times Lecture Notes in Computer Science, Vol. 3982, pp. 700-709. (2006.05) |
2005 1. | Kim, H.-J., Kim, Y.-D., and Lee, D.-H. Scheduling for an Arc Welding Robot considering Heat-caused Distortion Journal of the Operational Research Society, Vol. 56, pp. 39-50. (SCI) |
2. | Kim, H.-J., Lee, D.-H., and Xirouchakis, P. A Lagrangean Relaxation Approach for Capacitated Disassembly Scheduling Lecture Notes in Computer Science, Vol. 3483, pp. 722-732. (2005.05) |
3. | Kim, H.-J., Lee, D.-H., and Xirouchakis, P. An Optimal Algorithm for Disassembly Scheduling with Assembly Product Structure Lecture Notes in Artificial Intelligence, Vol. 3698, pp. 235-248. (2005.09) |
4. | Kim, J.-G., Jeon, H.-B., Kim, H.-J., Lee, D.-H., and Xirouchakis, P. Capacitated Disassembly Scheduling: Minimizing the Number of Products Disassembled Lecture Notes in Computer Science, Vol. 3483, pp. 538-547. |
5. | Lee, D.-H. Disassembly Scheduling for Products with Assembly Structure International Journal of Management Science, Vol. 11, pp. 63-78. (2005.05) |
2004 1. | Lee, D.-H., and Xirouchakis, P. A Two-Stage Heuristic for Disassembly Scheduling with Assembly Product Structure Journal of the Operational Research Society, Vol. 55, No. 3, pp. 287-297. (SCI) |
2. | Lee, D.-H., Kim, H.-J., Choi, G. and Xirouchakis, P. Disassembly Scheduling: Integer Programming Models Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 218, pp. 1357-1372. (SCI) |
3. | Lee, D.-H., Kiritsis, D., and Xirouchakis, P. An Iterative Approach to Operation Selection and Sequencing in Process Planning International Journal of Production Research. Vol. 42, pp. 4745-4766. (SCI) |
2003 1. | Kang, J.-G., Lee, D.-H., and Xirouchakis, P. Disassembly Sequencing with Imprecise Data: a Case Study International Journal of Industrial Engineering Special Issue, Vol. 10, No.4, pp. 407-412. (SCIE) |
2. | Kim, H.-J., Lee, D.-H., Xirouchakis, P., and Zust, R. Disassembly Scheduling with Multiple Product Types CIRP Annals Manufacturing Technology, Vol. 52, No. 1, pp. 403-406. (SCIE) |
2002 1. | Lee, D.-H., Kiritsis, D., and Xirouchakis, P. Operation Sequencing in Nonlinear Process Planning: Local Search Heuristics Studies in Informatics and Control, Vol. 11, No. 1, pp. 73-90 |
2. | Lee, D.-H., Xirouchakis, P., and Zust, R. Disassembly Scheduling with Capacity Constraints CIRP Annals Manufacturing Technology, Vol. 51, No. 1, pp. 387-390. (SCIE) |
2001 1. | Kang, J.-G., Kraftsik, G., Lee, D.-H., and Xirouchakis, P. A Simulation Study on Telephone Remanufacturing Processes International Journal of Environmentally Conscious Design & Manufacturing. Vol. 10, No. 4, pp. 9-22 |
2. | Kang, J.-G., Lee, D.-H., Xirouchakis, P., and Persson, J.-G. Parallel Disassembly Sequencing with Sequence-Dependent Operation Times CIRP Annals Manufacturing Technology, Vol. 50, pp. 343-346. (SCIE) |
3. | Kim, Y.-D., Lee, D.-H., and Yoon, C.-M. Two-Stage Heuristic Algorithms for Part Input Sequencing in Flexible Manufacturing Systems European Journal of Operational Research, Vol. 133, No. 3, pp. 624-634. (SCIE) |
4. | Lee, D.-H., Kang, J.-G., and Xirouchakis, P. Disassembly Planning and Scheduling: Review and Further Research Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, Vol. 215, No. 5, pp. 695-710. (2001.05) 공동(제1) SCI |
5. | Lee, D.-H., Kiritsis, D., and Xirouchakis, P. Branch and Fathoming Algorithms for Operations Sequencing in Process Planning International Journal of Production Research, Vol. 39, No. 8, pp. 1649-1669. (2001.05) 공동(제1) SCI |
6. | Lee, D.-H., Kiritsis, D., and Xirouchakis, P. Search Heuristics for Operation Sequencing in Process Planning International Journal of Production Research, Vol. 39, No. 16, pp. 3771-3788. (SCI) |
7. | Neuendorf, K.-P., Lee, D.-H., Kiritsis, D., and Xirouchakis, P. Disassembly Scheduling with Parts Commonality Using Petri-Nets with Timestamps Fundamenta Informaticae, Vol. 47, No. 3-4, pp. 295-306. (SCIE) |
2000 1. | Kim, J.-G., Kim, Y.-D., and Lee, D.-H. Simulated Annealing Algorithms for Locating Pickup and Delivery Points in Automated Guided Vehicle Systems Journal of Engineering Valuation and Cost Analysis, Vol. 3, No. 4, pp. 205-215. |
2. | Lee, D.-H. and Kim, Y.-D. Loading Algorithms for Flexible Manufacturing Systems with Partially Grouped Machines IIE Transactions, Vol. 32, No. 1, pp. 33-47. (SCI) |
1999 1. | Lee, D.-H. and Kim, Y.-D. Scheduling Algorithms for Flexible Manufacturing Systems with Partially Grouped Machines Journal of Manufacturing Systems, Vol. 18, No. 4, pp. 301-309. (SCIE) |
1998 1. | Kim, Y.-D., Lee, D.-H., Kim, J.-U., and Roh, H.-K. A Simulation Study on Lot Release Control, Dispatching and Batch Scheduling in Semiconductor Wafer Fab Journal of Manufacturing Systems, Vol. 17, No. 2, pp. 107-117. (SCIE) |
2. | Lee, D.-H. and Kim, Y.-D. Iterative Procedures for the Multi-Period Order Selection and Loading Problems in Flexible Manufacturing Systems International Journal of Production Research, Vol. 36, No. 10, pp. 2653-2668. (SCI) |
3. | Lee, D.-H. and Kim, Y.-D. A Multi-Period Order Selection Problem in Flexible Manufacturing Systems Journal of the Operational Research Society, Vol. 49, No. 3, pp. 278-286. (SCI) |
1997 1. | Lee, D.-H., Lim, S.-K., Lee, G.-C., Jun, H.-B., and Kim, Y.-D. Multi-Period Part Selection and Loading Problems in Flexible Manufacturing System Computers and Industrial Engineering Special Issue, Vol. 33, Nos. 3-4, pp. 541-544. (SCIE) |
1996 1. | Lee, D.-H. and Kim, Y.-D. Part-Mix Allocation in a Hybrid Manufacturing System with a Flexible Manufacturing Cell and a Conventional Jobshop International Journal of Production Research, Vol. 34, No. 5, pp. 1347-1360. (SCI) | |