International Journals - Production & Logistics Information Lab
2026
- Kim, H.-I., and Lee, D.-H. (2026). Two-phase optimal and heuristic algorithms for flow shop scheduling with reworks under overlapped queue time limits, European Journal of Operational Research, 332(2): 376-390. https://doi.org/10.1016/j.ejor.2025.12.048
2025
- Sim, D.-G., and Lee, D.-H. (2025). A two-stage solution approach for scheduling flexible manufacturing systems with multi-fixturing pallets, Flexible Services and Manufacturing Journal, 37(4): 1251-1275. https://doi.org/10.1007/s10696-024-09567-5
- Kim, H.-I., Kim, Y.-R., and Lee, D.-H. (2025). A genetic programming based reinforcement learning algorithm for dynamic hybrid flow shop scheduling with reworks under general queue time limits, Computers & Industrial Engineering, 203: 111062. https://doi.org/10.1016/j.cie.2025.111062
- Kim, H.-I., Youn, A.-J., and Lee, D.-H. (2025). A mathematical model and solution algorithms for optimizing system-level configurations of reconfigurable single part flow lines, International Journal of Production Research, 63(1): 9-25. https://doi.org/10.1080/00207543.2024.2355324
2024
- Cho, Y., Kim, H.-I., Kim, Y.-R., Yoo, S.-K., Kim, B.-H., and Lee, D.-H. (2024). A scheduling mechanism for hybrid flow shops with reworks under general queue time limits, Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 238(6-7): 962-970. https://doi.org/10.1177/09544054231182174
- Jung, H., Kim, H.-I., and Lee, D.-H. (2024). Team orienteering with possible multiple visits: Mathematical model and solution algorithms, Computers & Industrial Engineering, 190: 110097. https://doi.org/10.1016/j.cie.2024.110097
- Doh, H.-H., and Lee, D.-H. (2024). Dynamic lot-sizing for remanufacturing systems with multi-level structured products and components commonality, Applied Mathematical Modelling, 125(A): 789-808. https://doi.org/10.1016/j.apm.2023.09.020
2023
- Choi, Y.-H., Kim, H.-I., and Lee, D.-H. (2023). Disassembly leveling and lot-sizing for multiple product types with uncertain component demands, Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 237(11): 1660-1670. https://doi.org/10.1177/09544054221136526
- Kim, H.-I., and Lee, D.-H. (2023). Scheduling algorithms for multi-stage flow shops with reworks under overlapped queue time limits, International Journal of Production Research, 61(20): 6908-6922. https://doi.org/10.1080/00207543.2022.2139004
2022
- Doh, H.-H., and Lee, D.-H. (2022). Integrated disassembly and reprocessing lot-sizing for multi-level structured products in remanufacturing systems, Engineering Optimization, 54(9): 1476-1493. https://doi.org/10.1080/0305215X.2021.1940990
2021
- Zeid, I. B., Doh, H.-H., Shin, J.-H., and Lee, D.-H. (2021). Fast and meta heuristics for part selection in flexible manufacturing systems with controllable processing times, Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 235(4): 650-662. https://doi.org/10.1177/0954405420968172
2020
- Lee, D.-K., Shin, J.-H., and Lee, D.-H. (2020). Operations scheduling for an advanced flexible manufacturing system with multi-fixturing pallets, Computers & Industrial Engineering, 144: 106496. https://doi.org/10.1016/j.cie.2020.106496
- Shin, J.-H., Yu, J.-M., Doh, H.-H., Kim, H.-W., and Lee, D.-H. (2020). Batching and scheduling for a single-machine flexible machining cell with multi-fixturing pallets and controllable processing times, International Journal of Production Research, 58(3): 863-877. https://doi.org/10.1080/00207543.2019.1602742
2019
- Kim, J.-S., and Lee, D.-H. (2019). Collection network design with capacity planning in reverse logistics: Static and restricted dynamic models, Engineering Optimization, 51(8): 1430-1445. https://doi.org/10.6084/m9.figshare.7209620
- Kim, H.-W., Joo, G.-H., and Lee, D.-H. (2019). Multi-period heterogeneous vehicle routing considering carbon emission trading, International Journal of Sustainable Transportation, 13(5): 340-349. https://doi.org/10.1080/15568318.2018.1471555
- Zhou, Y.-D., Shin, J.-H., and Lee, D.-H. (2019). Loading and scheduling for flexible manufacturing systems with controllable processing times, Engineering Optimization, 51(3): 412-426. http://doi.org/10.1080/0305215X.2018.1469134
2018
- Kim, H.-W., Park, C., and Lee, D.-H. (2018). Selective disassembly sequencing with random operation times in parallel disassembly environment, Computers & Industrial Engineering, 56(24): 7243-7257. https://doi.org/10.1080/00207543.2018.1432911
- Ulugov, A., Shin, J.-H., and Lee, D.-H. (2018). Common due-date assignment and scheduling on a single machine with sequence-dependent setups and discretely controllable job processing times, International Journal of Industrial Engineering: Theory, Applications and Practice, 25(5): 580-589. https://doi.org/10.23055/ijietap.2018.25.5.3676
- Yu, J.-M., and Lee, D.-H. (2018). Scheduling algorithms for job-shop-type remanufacturing systems with component matching requirement, Computers & Industrial Engineering, 120: 266-278. https://doi.org/10.1016/j.cie.2018.04.048
- Kim, D.-H., Doh, H.-H., and Lee, D.-H. (2018). Multi-period disassembly levelling and lot-sizing for multiple product types with parts commonality, Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 232(5): 867-878. https://doi.org/10.1177/0954405416661001
- Kim, H.-W., and Lee, D.-H. (2018). A sample average approximation algorithm for selective disassembly sequencing with abnormal disassembly operations and random operation times, The International Journal of Advanced Manufacturing Technology, 96(1-4): 1341-1354. https://doi.org/10.1007/s00170-018-1667-9
- Yu, J.-M., and Lee, D.-H. (2018). Solution algorithms to minimise the total family tardiness for job shop scheduling with job families, European Journal of Industrial Engineering, 12(1): 1-23. https://doi.org/10.1504/EJIE.2018.089876
2017
- Kim, H.-W., and Lee, D.-H. (2017). An optimal algorithm for selective disassembly sequencing with sequence-dependent setups in parallel disassembly environment, International Journal of Production Research, 55(24): 7317-7333. https://doi.org/10.1080/00207543.2017.1342879
- Kim, J.-S., Park, J.-H., and Lee, D.-H. (2017). Iterated greedy algorithms to minimize total family flow time for job shop scheduling with job families and sequence-dependent setups, Engineering Optimization, 49(10): 1719-1732. https://doi.org/10.1080/0305215X.2016.1261247
- Kim, J.-M., Zhou, Y.-D., and Lee, D.-H. (2017). Priority scheduling to minimize the total tardiness for remanufacturing systems with flow-shop-type reprocessing lines, The International Journal of Advanced Manufacturing Technology, 91(9-12): 3697-3708. https://doi.org/10.1007/s00170-017-0057-z
- Yu, J.-M., Huang, R., and Lee, D.-H. (2017). Iterative algorithms for batching and scheduling to minimize the total job tardiness in two-stage hybrid flow shops, International Journal of Production Research, 55(11): 3266-3282. https://doi.org/10.1080/00207543.2017.1304661
2016
- Doh, H.-H., Yu, J.-M., Kwon, Y.-J., Suh, M.-S., and Lee, D.-H. (2016). Priority scheduling for a flexible job shop with a reconfigurable manufacturing cell, Industrial Engineering & Management Systems, 15(1): 11-18. https://doi.org/10.7232/iems.2016.15.1.011
- Kang, K.-W., Doh, H.-H., Park, J.-H., and Lee, D.-H. (2016). Disassembly leveling and lot-sizing for multiple product types: A basic model and its extension, The International Journal of Advanced Manufacturing Technology, 82(9-12): 1463-1473. https://doi.org/10.1177/09544054221136526
2015
- Lee, C.-W., Doh, H.-H., and Lee, D.-H. (2015). Capacity and production planning for a hybrid system with manufacturing and remanufacturing facilities, Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 229(9): 1645-1653. https://doi.org/10.1177/0954405414539485
- Kim, M.-G., Yu, J.-M., and Lee, D.-H. (2015). Scheduling algorithms for remanufacturing systems with flow-shop-type reprocessing lines, International Journal of Production Research, 53(6): 1819-1831. https://doi.org/10.1080/00207543.2014.962112
- Kim, J.-S., and Lee, D.-H. (2015). A case study on collection network design, capacity planning and vehicle routing in reverse logistics, International Journal of Sustainable Engineering, 8(1): 66-76. https://doi.org/10.1080/19397038.2014.947393
- Kim, J.-S., and Lee, D.-H. (2015). An integrated approach for collection network design, capacity planning and vehicle routing in reverse logistics, Journal of the Operational Research Society, 66(1): 76-85. https://doi.org/10.1057/jors.2013.168
2014
- Yu, Z.-J., Shin, J.-H., and Lee, D.-H. (2014). An operation-level dynamic capacity scalability model for reconfigurable manufacturing systems, International Journal of Industrial Engineering: Theory, Applications and Practice, 21(6): 317-326. https://doi.org/10.23055/ijietap.2014.21.6.1236
2013
- Kim, J.-S., and Lee, D.-H. (2013). A restricted dynamic model for designing refuse collection networks in reverse logistics, Computers & Industrial Engineering, 66(4): 1131-1137. https://doi.org/10.1016/j.cie.2013.08.001
- Lee, J.-H., Yu, J.-M., and Lee, D.-H. (2013). A tabu search algorithm for unrelated parallel machine scheduling with sequence and machine dependent setups: Minimizing total tardiness, The International Journal of Advanced Manufacturing Technology, 69(9-12): 2081-2089. https://doi.org/10.1007/s00170-013-5192-6
- Go, H., Kim, J.-S., and Lee, D.-H. (2013). Operation and preventive maintenance scheduling of containerships: Mathematical model and solution algorithm, European Journal of Operational Research, 229(3): 626-636. https://doi.org/10.1016/j.ejor.2013.04.005
- Han, H.-J., Yu, J.-M., and Lee, D.-H. (2013). Mathematical model and solution algorithms for selective disassembly sequencing with multiple target components and sequence-dependent setups, International Journal of Production Research, 51(16): 4997-5010. https://doi.org/10.1080/00207543.2013.788794
- Kwon, Y.-J., Choi, Y.-J., and Lee, D.-H. (2013). Heterogeneous fixed fleet vehicle routing considering carbon emission, Transportation Research Part D: Transport and Environment, 23: 81-89. http://doi.org/10.1016/j.trd.2013.04.001
- Yu, J.-M., Doh, H.-H., Kim, J.-S., Kwon, Y.-J., Lee, D.-H., and Nam, S.-H. (2013). Input sequencing and scheduling for a reconfigurable manufacturing system with a limited number of fixtures, The International Journal of Advanced Manufacturing Technology, 67(1): 157-169. https://doi.org/10.1007/s00170-013-4761-z
- Doh, H.-H., Yu, J.-M., Kim, J.-S., Lee, D.-H., and Nam, S.-H. (2013). A priority scheduling approach for flexible job shops with multiple process plans, International Journal of Production Research, 51(12): 3748-3764. https://doi.org/10.1080/00207543.2013.765074
2012
- Yu, J.-M., Doh, H.-H., Kim, H.-W., Kim, J.-S., Lee, D.-H., and Nam, S.-H. (2012). Iterative algorithms for part grouping and loading in cellular reconfigurable manufacturing systems, Journal of the Operational Research Society, 63(12): 1635-1644. https://doi.org/10.1057/jors.2012.9
- Kim, J.-G., Kim, J.-S., and Lee, D.-H. (2012). Fast and meta-heuristics for common due-date assignment and scheduling on parallel machines, International Journal of Production Research, 50(20): 6040-6057. https://doi.org/10.1080/00207543.2011.644591
- Jun, H.-B., Lee, D.-H., Kim, J.-G., and Kiritsis, D. (2012). Heuristic algorithms for minimizing total recovery cost of end-of-life products under quality constraint, International Journal of Production Research, 50(19): 5330-5347. https://doi.org/10.1080/00207543.2011.624562
- Kim, H.-W., Yu, J.-M., Kim, J.-S., Doh, H.-H., Lee, D.-H., and Nam, S.-H. (2012). Loading algorithms for flexible manufacturing systems with partially grouped unrelated machines and additional tooling constraints, The International Journal of Advanced Manufacturing Technology, 58(5-8): 683-691. https://doi.org/10.1007/s00170-011-3417-0
2011
- Ma, Y.-S., Jun, H.-B., Kim, H.-W., and Lee, D.-H. (2011). Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal, International Journal of Production Research, 49(23): 7007-7027. https://doi.org/10.1080/00207543.2010.495089
- Shim, I.-S., Kim, H.-C., Doh, H.-H., and Lee, D.-H. (2011). A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs, Computers & Industrial Engineering, 61(4): 920-929. https://doi.org/10.1016/j.cie.2011.06.002
- Yu, J.-M., Kim, J.-S., and Lee, D.-H. (2011). Scheduling algorithms to minimize the total family flow time for job shops with job families, International Journal of Production Research, 49(22): 6885-6903. https://doi.org/10.1080/00207543.2010.507609
- Ahn, H. D., Lee, D.-H., and Kim, H.-J. (2011). Solution algorithms for dynamic lot-sizing in remanufacturing systems, International Journal of Production Research, 49(22): 6729-6748. https://doi.org/10.1080/00207543.2010.535038
- Kim, J.-G., Kim, J.-S., and Lee, D.-H. (2011). A case study on period vehicle routing in a refuse collection system, International Journal of Sustainable Engineering, 4(3): 215-223. http://doi.org/10.1080/19397038.2011.556757
- Choi, H.-S., Kim, J.-S., and Lee, D.-H. (2011). Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line, Expert Systems with Applications, 38(4): 3514-3521. https://doi.org/10.1016/j.eswa.2010.08.139
2010
- Doh, H.-H., and Lee, D.-H. (2010). Generic production planning model for remanufacturing systems, Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 224: 159-168. https://doi.org/10.1243/09544054JEM1543
2009
- Kim, J.-G., and Lee, D.-H. (2009). Algorithms for common due-date assignment and sequencing in a single machine with sequence-dependent setup times, Journal of the Operational Research Society, 60: 1264-1272. https://doi.org/10.1057/jors.2008.95
- Choi, H.-S., Kim, H.-W., Lee, D.-H., Yun, J., Yoon, C. Y., and Chae, K. B. (2009). Scheduling algorithms for two-stage reentrant hybrid flow shops: Minimizing makespan under the maximum allowable due-dates, The International Journal of Advanced Manufacturing Technology, 42: 963-973. https://doi.org/10.1007/s00170-008-1656-5
- Kim, H.-W., and Lee, D.-H. (2009). Heuristics for reentrant hybrid flow shops with unrelated parallel machines, Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 223: 433-442. https://doi.org/10.1243/09544054JEM1318
- Kim, H.-J., Lee, D.-H., Xirouchakis, P., and Kwon, O.-K. (2009). A branch and bound algorithm for disassembly scheduling with assembly product structure, Journal of the Operational Research Society, 60: 419-430. https://doi.org/10.1057/palgrave.jors.2602568
- Choi, H.-S., and Lee, D.-H. (2009). Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops, Computers & Industrial Engineering, 56(1): 113-120. https://doi.org/10.1016/j.cie.2008.04.005
2008
- Park, S.-H., and Lee, D.-H. (2008). Sequencing algorithms for multiple arc-welding robots considering thermal distortion, International Journal of Production Research, 46(17): 4751-4767. https://doi.org/10.1080/00207540600898056
2007
- Kim, H.-J., Lee, D.-H., and Xirouchakis, P. (2007). Disassembly scheduling: Literature review and further research directions, International Journal of Production Research, 45(18-19): 4465-4484. https://doi.org/10.1080/00207540701440097
- Kim, S.-I., Choi, H.-S., and Lee, D.-H. (2007). Scheduling algorithms for parallel machines with sequence-dependent setup and distinct ready times: Minimizing total tardiness, Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 221(6): 1087-1096. https://doi.org/10.1243/09544054JEM779
2006
- Choi, S.-H., Park, M.-W., Lee, D.-H., Jeong, K.-C., Lim, S.-K., Kim, J.-G., and Lee, G.-C. (2006). A conceptual framework of an advanced planning and scheduling system for printed circuit board manufacturing lines, Asia Pacific Management Review, 11: 133-140. https://doi.org/10.6126/APMR.2006.11.3.01
- Kim, H.-J., Lee, D.-H., and Xirouchakis, P. (2006). A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints, Journal of the Operational Research Society, 57(10): 1231-1240. https://doi.org/10.1057/palgrave.jors.2602094
- Kim, J.-G., Jeon, H.-B., Kim, H.-J., Lee, D.-H., and Xirouchakis, P. (2006). Disassembly scheduling with capacity constraints: Minimizing the number of products disassembled, Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 220(9): 1473-1481. https://doi.org/10.1243/09544054JEM349
- Kim, S.-I., Choi, H.-S., and Lee, D.-H. (2006). Tabu search algorithms for parallel machine scheduling with sequence-dependent setup and ready times, Lecture Notes in Computer Science, 3982: 700-709. https://doi.org/10.1007/11751595_77
- Kim, H.-J., Lee, D.-H., and Xirouchakis, P. (2006). A two-phase heuristic for disassembly scheduling with multiple product types and parts commonality, International Journal of Production Research, 44: 195-212. https://doi.org/10.1080/00207540500244443
2005
- Kim, H.-J., Lee, D.-H., and Xirouchakis, P. (2005). An optimal algorithm for disassembly scheduling with assembly product structure, Lecture Notes in Artificial Intelligence, 3698: 235-248. https://doi.org/10.1007/11551263_20
- Kim, H.-J., Lee, D.-H., and Xirouchakis, P. (2005). A Lagrangean relaxation approach for capacitated disassembly scheduling, Lecture Notes in Computer Science, 3483: 722-732. https://doi.org/10.1007/11424925_76
- Kim, J.-G., Jeon, H.-B., Kim, H.-J., Lee, D.-H., and Xirouchakis, P. (2005). Capacitated disassembly scheduling: Minimizing the number of products disassembled, Lecture Notes in Computer Science, 3483: 538-547. https://doi.org/10.1007/11424925_57
- Kim, H.-J., Kim, Y.-D., and Lee, D.-H. (2005). Scheduling for an arc welding robot considering heat-caused distortion, Journal of the Operational Research Society, 56: 39-50. https://doi.org/10.1057/palgrave.jors.2601803
2004
- Lee, D.-H., Kiritsis, D., and Xirouchakis, P. (2004). An iterative approach to operation selection and sequencing in process planning, International Journal of Production Research, 42: 4745-4766. https://doi.org/10.1080/00207540410001720412
- Lee, D.-H., Kim, H.-J., Choi, G., and Xirouchakis, P. (2004). Disassembly scheduling: Integer programming models, Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 218: 1357-1372. https://doi.org/10.1243/0954405042323586
- Lee, D.-H., and Xirouchakis, P. (2004). A two-stage heuristic for disassembly scheduling with assembly product structure, Journal of the Operational Research Society, 55(3): 287-297. https://doi.org/10.1057/palgrave.jors.2601690
2003
- Kang, J.-G., Lee, D.-H., and Xirouchakis, P. (2003). Disassembly sequencing with imprecise data: A case study, International Journal of Industrial Engineering, 10(4): 407-412.
- Kim, H.-J., Lee, D.-H., Xirouchakis, P., and Zust, R. (2003). Disassembly scheduling with multiple product types, CIRP Annals - Manufacturing Technology, 52(1): 403-406. https://doi.org/10.1016/S0007-8506(07)60611-8
2002
- Lee, D.-H., Xirouchakis, P., and Zust, R. (2002). Disassembly scheduling with capacity constraints, CIRP Annals - Manufacturing Technology, 51(1): 387-390. https://doi.org/10.1016/S0007-8506(07)61543-1
- Lee, D.-H., Kiritsis, D., and Xirouchakis, P. (2002). Operation sequencing in nonlinear process planning: Local search heuristics, Studies in Informatics and Control, 11(1): 73-90. https://sic.ici.ro/vol-11-no-1-2002/operation-sequencing-in-nonlinear-process-planning-local-search-heuristics/
2001
- Kang, J.-G., Kraftsik, G., Lee, D.-H., and Xirouchakis, P. (2001). A simulation study on telephone remanufacturing processes, International Journal of Environmentally Conscious Design & Manufacturing, 10(4): 9-22.
- Lee, D.-H., Kiritsis, D., and Xirouchakis, P. (2001). Search heuristics for operation sequencing in process planning, International Journal of Production Research, 39(16): 3771-3788. https://doi.org/10.1080/00207540110061922
- Neuendorf, K.-P., Lee, D.-H., Kiritsis, D., and Xirouchakis, P. (2001). Disassembly scheduling with parts commonality using Petri-nets with timestamps, Fundamenta Informaticae, 47(3-4): 295-306. https://doi.org/10.3233/FUN-2001-473-410
- Kim, Y.-D., Lee, D.-H., and Yoon, C.-M. (2001). Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems, European Journal of Operational Research, 133(3): 624-634. https://doi.org/10.1016/S0377-2217(00)00210-1
- Kang, J.-G., Lee, D.-H., Xirouchakis, P., and Persson, J.-G. (2001). Parallel disassembly sequencing with sequence-dependent operation times, CIRP Annals - Manufacturing Technology, 50: 343-346. https://doi.org/10.1016/S0007-8506(07)62136-2
- Lee, D.-H., Kang, J.-G., and Xirouchakis, P. (2001). Disassembly planning and scheduling: Review and further research, Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 215(5): 695-710. https://doi.org/10.1243/0954405011518629
- Lee, D.-H., Kiritsis, D., and Xirouchakis, P. (2001). Branch and fathoming algorithms for operations sequencing in process planning, International Journal of Production Research, 39(8): 1649-1669. https://doi.org/10.1080/00207540010028100
2000
- Kim, J.-G., Kim, Y.-D., and Lee, D.-H. (2000). Simulated annealing algorithms for locating pickup and delivery points in automated guided vehicle systems, Journal of Engineering Valuation and Cost Analysis, 3(4): 205-215. https://doi.org/10.1088/1757-899X/697/1/012021
- Lee, D.-H., and Kim, Y.-D. (2000). Loading algorithms for flexible manufacturing systems with partially grouped machines, IIE Transactions, 32(1): 33-47. https://doi.org/10.1023/A:1007651329917
1999
- Lee, D.-H., and Kim, Y.-D. (1999). Scheduling algorithms for flexible manufacturing systems with partially grouped machines, Journal of Manufacturing Systems, 18(4): 301-309. https://doi.org/10.1016/S0278-6125(00)86632-7
1998
- Lee, D.-H., and Kim, Y.-D. (1998). Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems, International Journal of Production Research, 36(10): 2653-2668. https://doi.org/10.1080/002075498192418
- Kim, Y.-D., Lee, D.-H., Kim, J.-U., and Roh, H.-K. (1998). A simulation study on lot release control, dispatching and batch scheduling in semiconductor wafer fabrication facilities, Journal of Manufacturing Systems, 17(2): 107-117. https://doi.org/10.1016/S0278-6125(98)80024-1
- Lee, D.-H., and Kim, Y.-D. (1998). A multi-period order selection problem in flexible manufacturing systems, Journal of the Operational Research Society, 49(3): 278-286. https://doi.org/10.1057/palgrave.jors.2600525
1997
- Lee, D.-H., Lim, S.-K., Lee, G.-C., Jun, H.-B., and Kim, Y.-D. (1997). Multi-period part selection and loading problems in flexible manufacturing system, Computers & Industrial Engineering, 33(3-4): 541-544. https://doi.org/10.1016/S0360-8352(97)00188-5
1996
- Lee, D.-H., and Kim, Y.-D. (1996). Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional job shop, International Journal of Production Research, 34(5): 1347-1360. https://doi.org/10.1080/00207549608904969