Alumni

Ph.D. Students

2026

Dr. Hyeon-Il Kim (김현일박사, KTH Royal Institute of Technology, Stockholm, Sweden), Ph.D. in Industrial Engineering (Thesis: Hybrid Flow Shop Scheduling with Reworks under Overlapped Queue Time Limits: Mathematical Models and Static/Dynamic Algorithms)

2025

Dr. Jeong-Hoon Shin (신정훈박사), Ph.D. in Industrial Engineering (Thesis: Batching and Scheduling for Single Jig Center Flexible Manufacturing Systems with Controllable Processing Times) – Planned 

2022

Dr. Hyoung-Ho Doh (도형호박사, 육군 분석평가단), Ph.D. in Industrial Engineering (Thesis: Dynamic Lot-sizing Algorithms for Remanufacturing Systems with Multi-level Structured Products and Components Commonality)

2018

Dr. Hyung-Won Kim (김형원박사, LG-Display), Ph.D. in Industrial Engineering (Thesis: Deterministic and Stochastic Models for Selective Disassembly Sequencing with Sequence-dependent Setups in Parallel Disassembly Environment)

Dr. Jae-Min Yu (유재민박사, LG-CNS), Ph.D. in Industrial Engineering (Thesis: Due-date based Scheduling for Remanufacturing Systems with a Job-shop-type Reprocessing shop: Mathematical Models and Solution Algorithms)

2014

Dr. Ji-Su Kim (김지수박사), Ph.D. in Industrial Engineering (Thesis: Refuse Collection Network Design and Vehicle Routing in Reverse Logistics)

2009

Dr. Hyun-Seon Choi (최현선박사, LG-Display), Ph.D. in Industrial Engineering (Thesis: Scheduling Algorithms for Unidirectional and Reentrant Hybrid Flow Shops)

Dr. Jun-Gyu Kim (김준규박사, CJ), Ph.D. in Industrial Engineering (Thesis: Common Due-Date Assignment and Scheduling in Single and Parallel Machines with Sequence Independent and Dependent Setup Times) 

2005

Prof. Hwa-Joong Kim (김화중교수, co-worked at EPFL), Ph.D. in Mechanical Engineering (Thesis: Disassembly Scheduling: Models and Algorithms), Working at INHA University (인하대학교교수), Incheon, Republic of Korea
 
Dr. Jun-Gyu Kang (강준규박사, co-worked at EPFL)
, Ph.D. in Mechanical Engineering (Thesis: Parallel Disassembly Planning for Increasing the End-of-life Value of Products), Working at SILOCON2 CO. LTD. Sungnam, Republic of Korea 

Dr. Dmytro Sakara (co-worked at EPFL), Ph.D. in Mechanical Engineering (Thesis: Modeling and Scheduling of Remanufacturing Systems) 

M.S. Students

2026

Jun-Yeong Lee (이준영) MS in Industrial Engineering (Thesis:An Iterative Approach for Configuration Selection and Scheduling of Reconfigurable Multi-part Flow Lines with Controllable Processing Times) 

Hyeon-Ji Moon (문현지) MS in Industrial Engineering (Thesis:DynamicConfiguration Selection for Reconfigurable Single-part Flow Lines with Controllable Processing Times) 

2025

Keon-Min Lee (이건민) MS in Industrial Engineering (Thesis:Disassembly Leveling and Lot-sizing with Uncertain Component Yields) 

Chenghan Bai (백정한) MS in Industrial Engineering (Thesis:A Genetic Programming based Scheduling Approach for Remanufacturing Systems with Flow-shop-type Disassembly, Reprocessing and Reassembly Lines) 

2024

Ae-Jin Youn (윤애진) MS in Industrial Engineering (Thesis:System-level Configuration Optimization Algorithms for Reconfigurable Single Part Flow Lines with Controllable Processing Times) 

2023

Yeo-Reum Kim (김여름) MS in Industrial Engineering (Thesis:A Genetic Programming based Deep Reinforcement Learning Approach for Dynamic Hybrid Flow Shop Scheduling with Reworks under General Queue Time Limits)

Hyun-Bum Jung (정현범) MS in Industrial Engineering (Thesis:Team Orienteering with Possible Multiple Visits: A Mathematical Model and Solution Algorithms)

Dong-Gi Sim (심동기) MS in Industrial Engineering (Thesis:A Greedy Randomized Adaptive Search based Solution Approach for Scheduling Flexible Manufacturing Systems with Multi-fixturing Pallets)

Xuebin Li (이학빈) MS in Industrial Engineering (Thesis:Capacity Scalability Planning Algorithms for Job-shop-type Reconfigurable Manufacturing Systems with Dynamic Demands)

2022

Hyeon-Il Kim (김현일) MS in Industrial Engineering (Thesis:Scheduling Algorithms for Multi-stage Flow Shops with Reworks under Overlapped Queue Time Limits)

2021

Yun-Hyok Choi (최윤혁) MS in Industrial Engineering (Thesis:Disassembly Leveling and Lot-sizing for Multiple Product Types with Uncertain Component Demands)

Seong-Sik Heo (허성식) MS in Industrial Engineering (Thesis:Priority Rule and Machine Learning based Scheduling for a Flexible Manufacturing System with Multi-fixturing Pallets)

2020

Haneol Choi (최한얼) MS in Industrial Engineering (Thesis:Priority Scheduling for a Flexible Manufacturing System with Multiple Loading/unloading Stations and Multi-fixturing Pallets)

2019

Yooney Cho (조윤희) MS in Industrial Engineering (Thesis:Mathematical Model and Solution Approaches for Multi-stage Hybrid Flow Shop Scheduling with Reworks under General Queue Time Limits)

2018

Dong-Kyu Lee (이동규) MS in Industrial Engineering (Thesis:Pallet Loading and Scheduling for Flexible Manufacturing Systems with Multi-fixturing Pallets)

Issa Bou Zeid MS in Industrial Engineering (Thesis:Due-date based Multi-period Part Selection for Flexible Manufacturing Systems with Controllable Processing Times)

2017

Yi-Dong Zhou MS in Industrial Engineering (Thesis:Loading and scheduling algorithms for flexible manufacturing systems with controllable processing times)

2016

Akmal Ulugov MS in Industrial Engineering (Thesis:Common Due-date Assignment and Scheduling on a Single Machine with Sequence-dependent Setups and Discretely Controllable Job Processing Times)

Ga-Hyeon Joo (주가현) MS in Industrial Engineering (Thesis: Heterogeneous Period Vehicle Routing Considering Carbon Emission: Mathematical Model and Solution Algorithm)  

Jong-Min Kim (김종민) MS in Industrial Engineering (Thesis: Priority rule based scheduling to minimize total tardiness for flow-shop-type remanufacturing systems)

Rong Huang, MS in Industrial Engineering (Thesis: Iterative Algorithms for Batching and Scheduling to Minimize the Total Tardiness in Two-stage Hybrid Flow Shops) 

2014

Young-Hye Cho (조영혜), MS in Industrial Engineering (Thesis: Capacitated Dynamic Lot-sizing Model for Remanufacturing Systems: Mathematical Model and Solution Algorithms) 

Daniel Cuche, MS in Energy Engineering (Thesis: A Multi-agent Evolutionary Algorithm for Job Shop Scheduling with Operators)

2013

Zhou-Jing Yu, MS in Industrial Engineering (Thesis: An Operation-level Capacity Scalability Model for Reconfigurable Manufacturing Systems) 

Jung-Hyeon Park (박중현), MS in Industrial Engineering (Thesis: Scheduling Algorithms for Job Shops with Job Families and Sequence-dependent Setup Times: Minimizing the Total Family Flow Time) 

Min-Geun Kim (김민근), MS in Industrial Engineering (Thesis: Scheduling Algorithms for Remanufacturing Systems with Parallel Flow-Shop-Type Reprocessing Lines)  

Cheol-Won Lee (이철원), MS in Industrial Engineering (Thesis: A Capacity and Production Planning Model for Hybrid Production Systems with Manufacturing and Remanufacturing Facilities)

2012

Dong-Hyun Kim (김동현), MS in Industrial Engineering (Thesis: Multi-period disassembly leveling and scheduling for multiple product types with parts commonality: mathematical model and solution algorithm)

Young-Jae Choi (최영재), MS in Industrial Engineering (Thesis: Meta-heuristics for heterogeneous vehicle routing considering carbon emission and trading) 

Hee-Jong Han (한희종), MS in Industrial Engineering (Thesis: Mathematical model and solution algorithm for selective disassembly sequencing with multiple target components and sequence-dependent setups)  

2011

Hun Go (고훈), MS in Industrial Engineering (Thesis: A mathematical model and solution algorithms for preventive maintenance scheduling of containerships) 

Kyung-Wan Kang  (강경완), MS in Industrial Engineering (Thesis: Disassembly leveling and lot-sizing for multiple product types: basic model and an extension) 

Jae-Ho Lee (이재호), MS in Industrial Engineering (Thesis: A tabu search algorithm for unrelated parallel machine scheduling with sequence- and machine-dependent setups: minimizing total tardiness) 

2010

Ik-Su Shim (심익수), MS in Industrial Engineering (Thesis: Capacitated Lot Sizing and Scheduling with Sequence-Dependent Setup Costs) 

Hyung-Dae Ahn (안형대), MS in Industrial Engineering (Thesis: A Dynamic Lot Sizing Model for Remanufacturing Systems) 

Kyung-Woon Ha (하경운), MS in Industrial Engineering (Thesis: Priority Rule based Fast Heuristics for the Team Orienteering Problem)

2009

Yoen-Seok Ma (마연석), MS in Industrial Engineering (Thesis: A Disassembly Process Planning Algorithm for End-of-Life Products Recovery and EnvironmentallyConscious Disposal)   

Jae-Min Yu (유재민), MS in Industrial Engineering (Thesis: Scheduling Algorithms for Job Shops with Job families: Minimizing the sum of the maximum family flow times) 

Hyoung-Ho Doh (도형호), MS in Industrial Engineering (Thesis: Production Planning in Remanufacturing Systems: Mathematical Model and Solution Algorithms)

2008

Hyung-Won Kim (김형원), MS in Industrial Engineering (Thesis: Scheduling Algorithms for Hybrid Flow Shops with Reentrant Flows and Unrelated Parallel Machines)

Hyeok-Chol Kim (김혁철), MS in Industrial Engineering (Thesis: A Case Study on Capacitated Lot Sizing and Scheduling in a Paper Remanufacturing System)

Kwang-Bok Lee (이광복), MS in Industrial Engineering (Thesis: Heuristic Algorithms for Mixed Model Disassembly Line Balancing Problem)  

2007

Ji-Su Kim (김지수), MS in Industrial Engineering (Thesis: Heuristic Algorithms for Collection Network Design problem) 

Jae-Dong Kim (김재동), MS in Industrial Engineering (Thesis: Vehicle Routing in a Refuse Collection System: a Case Study) 

Yong-Ju Kwon (권용주), MS in Industrial Engineering (Thesis: A Tabu Search Algorithm using Voronoi Diagram for the Capacitated Vehicle Routing)  

Byeong-Min Cho (조병민), MS in Industrial Engineering (Thesis: A Heuristic Algorithm for the Period Vehicle Routing Problem: Minimizing the Fleet Size) 

2006

Hyong-Bae Jeon (전형배), MS in Industrial Engineering (Thesis: A Study on Capacitated Disassembly Scheduling Problems) 

Sang-Hyun Park (박상현), MS in Industrial Engineering (Thesis: Scheduling Algorithms for Multiple Arc-Welding Robots Considering Thermal Distortion) 

Sang-Il Kim (김상일), MS in Industrial Engineering (Thesis: Scheduling Algorithms for Parallel Machines with Sequence-dependent Setup and Ready Times: Minimizing Total Tardiness)