Projects - Production & Logistics Information Lab
Research projects funded by national agencies, universities and industry partners.
In Progress2 projects
- 2026.03 – 2028.02
Capacitated Disassembly Leveling and Lot-sizing for End-of-life Products with Uncertain Component Yields: Mathematical Models and Solution Algorithms
Principal investigator - 2020.09 – 2027.08
An Education and Research Team for Sharing and Cooperation based Smart Systems
Participant
Finished35 projects
- 2025.08 – 2026.05
System-level Configuration Optimization Algorithms for Reconfigurable Single Part Flow Lines with Controllable Processing Times
Principal investigator - 2022.06 – 2025.02
Hybrid Flow Shop Scheduling with Reworks under Overlapped Queue Time Limits: Mathematical Models and Predictive/Reactive Algorithms
Principal investigator - 2022.04 – 2024.12
Development of an AI-based Production Planning Technology for Reconfigurable Manufacturing Systems
Sub-project PI - 2023.05 – 2024.04
Consulting Mathematical Optimization Algorithms
Principal investigator - 2023.07 – 2024.02
Priority Scheduling for Flexible Machining Systems with Multiple Setup Stations and Multi-fixturing Pallets
Principal investigator - 2021.12 – 2022.11
Development of Forecasting, Production Planning and Scheduling Algorithms and Framework for APS (Advanced Planning and Scheduling) System
Principal investigator - 2021.11 – 2022.10
Consulting Mathematical Optimization Algorithms
Principal investigator - 2020.06 – 2021.11
Dynamic Lot Sizing for Remanufacturing Systems with Multi-level Disassembly Structure: Mathematical Models and Solution Algorithms
Principal investigator - 2019.04 – 2019.12
Consulting Optimization Techniques
Principal investigator - 2015.06 – 2019.08
Development of a Jig-center Class 5-axis Horizontal Machining System Capable of over 24 Hours Continuous Operation
Sub-project PI - 2018.06 – 2019.02
Mathematical Model and Solution Algorithms for Hybrid Flow Shop Scheduling with Reworks under General Queue Time Limits
Principal investigator - 2018.01 – 2018.12
Consulting Optimization Techniques for Production Management Issues
Principal investigator - 2015.11 – 2016.10
Selective Disassembly Sequencing Algorithms for Recovering End-of-Use/Life Products
Principal investigator - 2014.04 – 2015.02
A New Dispatching Rule for Single Machine Sequencing to Minimize the Total Weighted Tardiness
Principal investigator - 2009.06 – 2014.05
Development of Integrated Operation Technology for Autonomous Reconfigurable Production Systems
Sub-project PI - 2011.05 – 2014.02
Planning and Scheduling for Remanufacturing Systems: Conceptual Framework and Solution Algorithms
Principal investigator - 2013.01 – 2013.12
An Integrated Collection Network Design and Vehicle Routing Model in Reverse Logistics
Principal investigator - 2009.11 – 2010.05
A Dynamic Lot Sizing Model for Remanufacturing Systems in Reverse Logistics
Co-investigator - 2009.05 – 2010.04
Designing Refuse Collection Networks in Reverse Logistics
Principal investigator - 2006 – 2010
Research Team for Bi-Directional Eco-Logistics
Team leader - 2008 – 2009
Operations Management in Remanufacturing Systems: Framework and Literature Review
Principal investigator - 2007 – 2008
Common Due Date Assignment and Scheduling in Single and Parallel Machines
Principal investigator - 2006 – 2007
Improving Operations in a Paper Remanufacturing Shop
Principal investigator - 2006 – 2007
The Proactive Design and Operation of the Closed-loop Supply Chain
Co-investigator - 2006 – 2007
Scheduling Algorithms for Reentrant Hybrid Flow Shops
Principal investigator - 2005 – 2006
Scheduling Algorithms for Hybrid Flow Shops: Minimizing the Number of Tardy Jobs
Principal investigator - 2005
Scheduling Algorithms for Parallel Machines with Ready Times: Minimizing Total Tardiness
Principal investigator - 2004
Scheduling Algorithms for Disassembly Systems Considering Capacity Constraints
Principal investigator - 2003
Disassembly Scheduling for Products with Assembly Structure
Principal investigator - 2002 – 2005
Planning and Scheduling in Remanufacturing Systems
Lead researcher - 2000 – 2002
Integrating Sustainability Aspects into First Step of Product Innovation: Training Courses in Decision Making and Planning
Participant - 1997 – 2000
Modeling and Simulation of Manufacturing Life Cycles
Participant - 1995 – 1996
Development of Production Planning Algorithms and Software for IAE-FMS
Lead researcher - 1995 – 1996
Production Planning and Scheduling in Semiconductor Manufacturing
Lead researcher - 1994
A Study on Production and Distribution Planning for Daewoo Motors Company
Principal investigator