[ WINTER 2016]
[ SUMMER 2016]
1. | The one-warehouse multi-retailer problem: reformulation, classification, and computational results | 07.19 |
2. | Models and algorithms for the dynamic-demand joint replenishment problem | 08.18 |
ISSA - M.S
1. | A Langrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers | 07.14 |
2. | A novel 0-1 linear integer programming model for dynamic machine-tool selection and operation allocation in a flexible manufacturing system | 08.04 |
3. | Solving Part Type Selection and Loading Problem in Flexible Manufacturing System Using Real Coded Genetic Algorithms | 08.18 |
Jang, Kyung Cheol - M.S
1. | Batching in production planning for flexible manufacturing systems | 07.19 |
2. | Machine loading and part type selection in flexible manufacturing systems | 08.11 |
Kim, Hyung Won - Ph.D
1. | Probability evaluation models of product disassembly cost subject to random removal time and different removal labor cost | 07.20 |
2. | A Chance Constrained Programming Approach to Determine the Optimal Disassembly Sequence | 08.09 |
Lee, Dong Kyu - M.S
1. | A Flexible Integrated Forward/Reverse Logistics Model with Random Path-based Memetic Algorithm | 07.26 |
2. | A constructive heuristic for minimizing makespan | 08.09 |
3. | Scheduling optimization of flexible manufacturing system using cuckoo search-based approach | 08.23 |
Shin, Jeong Hoon - Ph.D
1. | An adaptive TS approach to JIT sequencing with variable processing times and sequence-dependent setups. | 07.07 |
2. | On the N-Job, One-Machine, Sequence-Independent Scheduling Problem with Tardiness Penalties: A Branch-Bound Solution | 07.26 |
3. | Single machine scheduling with controllable processing times to minimize total tardiness and earliness | 08.23 |
Yu, Jae Min - Ph.D
1. | Evaluation of scatter-search approach for scheduling optimization of flexible manufacturing systems | 07.14 |
2. | A study on local search neighborhoods for the job shop scheduling problem with total tardiness objective | 08.02 |
Zhou YIdong - M.S
1. | A model technique for loading and scheduling problems in FMS | 07.12 |
2. | Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS。 | 07.28 |
3. | A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system. | 08.11 |