[ WINTER 2016]

Akmal - M.S

1. Single-machine scheduling with controllable processing times and earliness, tardiness and completion time penalties. 01.12
2. The single machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times. 01.26
3. Single machine scheduling problem with controllable processing times to minimize total tardiness and earliness. 02.16

Doh, Hyoung Ho - Ph.D

1. Integrated Lot Sizing in Serial Supply Chains with Production Capacities. 02.11
2. A dynamic inventory model with supplier selection in a serial supply chain structure. 02.16

ISSA - M.S

1. Minimizing flowtime and maximum earliness on a single machine. 02.24

Jang, Kyung Cheol - M.S

1. Part type selection problem in flexible manufacturing systems: tabu search algorithms 02.23

Joo, Ga Hyeon - M.S

1. A real-life Multi Depot Multi Period Vehicle Routing Problem with a Heterogeneous Fleet: Formulation and Adaptive Large Neighborhood Search based Metaheuristic. 01.07
2. A Tabu Search Heuristic for Periodic and Multi-Depot Vehicle Routing Problems. 01.20
3. A tabu search algorithm for the heterogeneous fixed fleet vehicle routing problem. 02.02

Kim, Hyung Won - Ph.D

1. Disassembly sequence structure graphs: An optimal approach for multiple-target selective disassembly sequence planning. 01.12
2. Integrated multi-layer representation and ant colony search for product selective disassembly planning. 02.04

Shin, Jeong Hoon - Ph.D

1. A branch and bound algorithm for scheduling jobs with controllable processing times on a single machine to meet due dates. 01.20

Yu, Jae Min - Ph.D

1. A branch-and-bound algorithm to minimize total weighted completion time on identical parallel machines with job release date. 01.07
2. A branch & bound algorithm for the open-shop problem. 02.02

Zhou YIdong - M.S

1. A competitive memetic algorithm for the distributed two-stage assembly flow-shop scheduling problem. 01.05
2. Single machine scheduling with common due date and controllable processing times. 01.26
3. OPTIMIZING CNC TURNING PROCESS USING REAL CODED GENETIC ALGORITHM AND DIFFERENTIAL EVOLUTION 02.23

[ SUMMER 2016]

Doh, Hyoung Ho - Ph.D

1. The one-warehouse multi-retailer problem: reformulation, classification, and computational results 07.19
2. Models and algorithms for the dynamic-demand joint replenishment problem 08.18

ISSA - M.S

1. A Langrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers 07.14
2. A novel 0-1 linear integer programming model for dynamic machine-tool selection and operation allocation in a flexible manufacturing system 08.04
3. Solving Part Type Selection and Loading Problem in Flexible Manufacturing System Using Real Coded Genetic Algorithms 08.18

Jang, Kyung Cheol - M.S

1. Batching in production planning for flexible manufacturing systems 07.19
2. Machine loading and part type selection in flexible manufacturing systems 08.11

Kim, Hyung Won - Ph.D

1. Probability evaluation models of product disassembly cost subject to random removal time and different removal labor cost 07.20
2. A Chance Constrained Programming Approach to Determine the Optimal Disassembly Sequence 08.09

Lee, Dong Kyu - M.S

1. A Flexible Integrated Forward/Reverse Logistics Model with Random Path-based Memetic Algorithm 07.26
2. A constructive heuristic for minimizing makespan 08.09
3. Scheduling optimization of flexible manufacturing system using cuckoo search-based approach 08.23

Shin, Jeong Hoon - Ph.D

1. An adaptive TS approach to JIT sequencing with variable processing times and sequence-dependent setups. 07.07
2. On the N-Job, One-Machine, Sequence-Independent Scheduling Problem with Tardiness Penalties: A Branch-Bound Solution 07.26
3. Single machine scheduling with controllable processing times to minimize total tardiness and earliness 08.23

Yu, Jae Min - Ph.D

1. Evaluation of scatter-search approach for scheduling optimization of flexible manufacturing systems 07.14
2. A study on local search neighborhoods for the job shop scheduling problem with total tardiness objective 08.02

Zhou YIdong - M.S

1. A model technique for loading and scheduling problems in FMS 07.12
2. Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS。 07.28
3. A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system. 08.11