[ WINTER 2010]
1. | design for end-of-lease computer products recovery. | 1.13 |
2. | A hybrid optimization-simulation approach for a distribution network design of 3PLS. | 2.22 |
Doh, Hyoung Ho - Ph.D
1. | Minimum concave cost production system_a further generalization of multiechelon model. | 1.27 |
2. | A capacity-constrained multi-level inventory and production control problem. | 2.15 |
Go, Hun - M.S
1. | Refinery units maintenance scheduling using integer programming. | 1.04 |
2. | An evolutionary programming-based solution methodology for power generation and transmission maintenance scheduling. | 1.31 |
3. | Hybrid evolutionary techniques for the maintenance scheduling problem. | 2.15 |
Han, Hee Jong - M.S
1. | Optimal disassembly sequencing strategy using constraint programming approach. | 1.18 |
2. | A non-interfering selective disassembly sequence. | 1.31 |
Kim, Dong Hyun - M.S
1. | . A hierarchical end-of-life decision model for determining the economic levels of remanufacturing and disassembly under environmental regulations. | 1.27 |
2. | Intelligent evaluation approach for electronic product recyling via case-based reasoning. | 2.22 |
3. | Model for the allocation of electronics components to reuse options. | 2.22 |
Kim, Hyung Won - Ph.D
1. | Scheduling a project to maximize its net present value - An integer programming approach EJOR. | 1.18 |
2. | Scheduling jobs under constant period-by-period resource availablility to maximize project profit at a due date IJAMT | 2.08 |
3. | Network decomposition techniques for resource constrained project scheduling JORS | 2.08 |
Kim, Min Geun - M.S
1. | Improving the location of minisum facilities through network modification. | 2.24 |
Lee, Chul Won - M.S
1. | A heuristic method for lot-sizing in multi-stage systems. | 2.24 |
Park, Jung Hyeo - M.S
1. | Balancing and simulating of assembly line with overlapped and stopped operation. | 2.24 |
Yu, Jae Min - Ph.D
1. | Machine sequencing via disjunctive graphs: An implicit enumeration algorithm. | 1.12 |
2. | An Implicit Enumeration Algorithm for the Machine Sequencing Problem. | 1.27 |
[ SUMMER 2010]
1. | A search heuristic for the sequence-dependent economic lot scheduling problem. (8.04) | |
2. | Sequencing Mixed-Model Assembly Lines with Genetic algorithms. (8.24) |
Go, Hun - M.S
1. | Maintenance scheduling by simulated annealing method. (8.17) | |
2. | A MIP model for mine equipment scheduling by minimizing maintenance cost. (8.04) | |
3. | Scheduling preventive reilway maintenance activity. (7.13) |
Han, Hee Jong - M.S
1. | A scatter search approach to the optimum disassembly sequence problem. (7.20) | |
2. | A hybrid Disassembly Sequence Planning Approach for Maintenance. (8.24) | |
3. | Algorithmic selection of a disassembly sequence of a componenet by a wave propagation method. (8.10) |
Jeong, Taek Seop - M.S
1. | A model for the Minimum cost configuration problem in flexible manufacturing systems. (8.04) |
Kang, Kyoung Wan - M.S
1. | A minimum cost flow model for level of repair analysis. (7.27) | |
2. | Integration of disassembly leveling and Bin assignment for demanufacturing automation. (8.17) | |
3. | Simultaneous selective disassembly and End-of-Life decision making for multiple products that share disassembly operations. (7.09) |
Kim, Dong Hyun - M.S
1. | A Genetic algorithm for integrating Lot-sizing and Sequencing in scheduling a capacitated Flow line. (8.04) | |
2. | A Heuristic algorithm for Sequencing on One Machine to Minimize Total Tardiness. (8.24) | |
3. | A heuristic method for Lot-sizing in Multi-stage systems. (7.20) |
Kim, Hyung Won - Ph.D
1. | Economic lot-sizing with remanufacturing options. (7.06) | |
2. | Heuristic for Multistage Production Planning Problems. (8.24) | |
3. | Inventory optimization in a one product recoverable manufacturing system. (7.27) |
Kim, Ji Su - Ph.D
1. | A review of hierarchical facility location models. (7.06) | |
2. | Generic model of reverse logistics newwork design. (8.10) | |
3. | Waste management in hierarchical facility location problem(Literature review, solution algorithms and case studies). (7.22) | |
4. | A column generation heuristic for a dynamic generalized assignment problem. | 1.04 |
5. | Dynamic facility location- The progressive p-median problem. | 1.04 |
6. | The multiperid location-allocation problem with relocation of facilities. | 1.18 |
Lee, Jae Ho - M.S
1. | Hybrid metaheuristic for unrelated parallel machine scheduling with sequence-dependent setup times. (8.19) | |
2. | Scheduling on unrelated paraellel machines with sequence and machine dependent setup times and due-date constraints. (7.13) | |
3. | Unrelated parallel machine scheduling with setup times using simulated annealing. (8.04) |
Yu, Jae Min - Ph.D
1. | Linguistic-based meta-heuristic optimization model for flexible job shop scheduling. (7.26) | |
2. | Job shop scheduling with alternative machines. (7.09) | |
3. | Mathematical models for job-shop scheduling problems with routing and process plan flexibility. (8.17) |